Laserfiche WebLink
" <br />" <br />" <br />" <br />" <br />"""" <br />"" <br />" <br />" <br />""""" <br />" <br />"" <br />" <br />" <br />" <br />" <br />" <br />" <br />" <br />Xä <br />" <br />" <br />" <br />" <br />" <br />" <br />" <br />" <br />"" <br />" <br />" <br />" <br />" <br />" <br />" <br />" <br />" <br />" <br />" <br />"" <br />" <br />" <br />" <br />" <br />" <br />" <br />" <br />" <br />" <br />" <br />" <br />"Xä <br />2J <br />2I <br />2A <br />2B <br />2E <br />¯1 inch = 600 feet <br />0 600 <br />FeetMain Street Master Plan <br />City of Lino Lakes, MN <br />Sanitary Sewer <br />" <br />" <br />" <br />" <br />"""" <br />"" <br />" <br />" <br />""""" <br />" <br />"" <br />" <br />" <br />" <br />" <br />" <br />" <br />" <br />ä <br />" <br />" <br />" <br />" <br />" <br />" <br />" <br />"" <br />" <br />" <br />" <br />""""" <br />" <br />" <br />"" <br />" <br />" <br />" <br />" <br />" <br />" <br />" <br />" <br />" <br />" <br />" <br />"ä <br />2I <br />2A <br />2B <br />2E <br />600 <br />Feet <br />ProSoseG *raYity Main <br />10 <br />1 <br />1 <br />1 <br />ProSoseG ForcePain <br />Xä ProSoseG Lift Station <br />*raYity Main <br /> <br />10 <br />1 <br />1 <br />1 <br />1 <br /> <br />ForcePain <br />Xä Lift Station <br />!(MC(S FloZ Meter <br />SXE'istrict %oXnGary <br />City %oXnGary <br />SCENARIO 2 - UTILITIES <br />SANITARY SEWER <br />The City’s sanitary sewer collection system will be extended <br />to serve the study area through a combination of 1) gravity <br />sewer extensions from the existing sanitary sewer system, <br />and 2) a new trunk sewer, lift station, and forcemain <br />referred to as the West Side Relief Sewer in the City’s 2040 <br />Comprehensive Plan. <br />The existing trunk sewer serving sanitary sewer district 2 is <br />nearing its capacity. Therefore, the West Side Relief Sewer is <br />needed to free up capacity by diverting existing sewers in <br />sub-district 2E and to serve new development in the study <br />area. The West Side Relief Sewer will be extended from Met <br />Council Interceptor 8361 located on North Road to the north <br />tKrRXJK VXEGiVtriFtV 2) 2E 2I anG ÀnaOOy 2J A SreOiPinary <br />conceptual layout for the West Side Relief Sewer was <br />outlined in the City’s 2040 Comprehensive Plan Figure 8-5 <br />with a combination of 21-inch trunk gravity sewer and a trunk <br />lift station and forcemain along the western edge of the City. <br />Main Street and the wetlands bordering it in the Gateway <br />Village scenario form a natural boundary for gravity <br />service within the study area. The area south of Main Street <br />can connect to existing sewers by gravity. As shown on <br />tKe Sanitary Sewer ÀJXre tKe e[iVtinJ Vanitary VewerV in <br />the vicinity of the study area include a 15-inch diameter <br />polyvinyl chloride (PVC) sanitary sewer along Century Trail, <br />12-inch PVC sanitary sewer along Robinson Drive, and <br />10-inch PVC sanitary sewer in Cardinal Way. A sewer stub <br />extends to the north from the manhole at the intersection <br />of Robinson Drive and Century Trail with an invert of <br />879.78. There is also a sanitary manhole at the north end of <br />Cardinal Way with an invert of 883.18. Inverts are according <br />to record plans for the Century Farms North development. <br />7Ke Sanitary Sewer 'iVtriFt ÀJXre VKRwV XSGateG VXEGiVtriFt <br />boundaries based on the Gateway Village scenario. The <br />area north of Main Street will be served by a new lift station. <br />The sub-district 2J lift station will need an ultimate capacity <br />of 1,000 gallons per minute (gpm) with either one 12-inch <br />diameter forcemain or dual 8-inch diameter forcemains <br />along Sunset Avenue (CSAH 53). The dual forcemains <br />would allow the phasing of pumps and piping from 500 <br />gpm to 1,000 gpm if desired depending on the pace of <br />development. Trunk sewers ranging in size from 10-inch to <br />15-inch diameter will extend northeast of the sub-district <br />2J lift station to serve the area north of Main Street. The far <br />northeast corner of the study area may discharge to other <br />inFK VewerV tR tKe eaVt GeSenGinJ Rn reOatiYe ÀnaO inYert <br />elevations. All proposed units will be required to connect to <br />the City’s sanitary sewer system. <br />The City’s sanitary sewer district 2 discharges to Metropolitan <br />Council Environmental Services (MCES) Meter M211 and <br />Interceptor 8361, and MCES is responsible for evaluating <br />necessary improvements to their interceptor system. <br />Wastewater is then conveyed to the Metropolitan <br />Wastewater Treatment Plant (Metro WWTP). The Metro WWTP <br />has a capacity of 314 million gallons per day (MGD) and <br />reFeiYeV  0*' RI ÁRw aV RI 0arFK 22 7Ke waVtewater <br />from the study area is anticipated to be of typical domestic <br />strength and character, so pretreatment is not necessary. <br />PINE STREET <br />4T <br />H <br /> <br />A <br />V <br />E <br />N <br />U <br />E <br />SU <br />N <br />S <br />E <br />T <br /> <br />A <br />V <br />E <br />N <br />U <br />E <br />CARL STREET <br />CENTURY <br /> <br />T <br />R <br />A <br />I <br />L <br />ROBINSON DRIVE <br />MAIN STREET <br />MAPPING NORTHWEST MAIN - MAIN STREET MASTER PLAN <br />AUGUST 25, 2025 PREFERRED DEVELOPMENT SCENARIO | 34Page 88 of 171