My WebLink
|
Help
|
About
|
Sign Out
Home
Search
09/10/2025 PZ Combined Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2025
>
09/10/2025 PZ Combined Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2025 3:04:44 PM
Creation date
9/5/2025 3:04:35 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
09/10/2025
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Memorandum <br />To:Katie Larsen, City Planner, City of Lino Lakes <br />From:Kris Keller, WSB <br />Diane Hankee, City Engineer, City of Lino Lakes <br />Date:September 3, 2025 <br />nd <br />Re: Lake Amelia Woods 2 Addition <br />Final Plat Review <br /> WSB Project Number – 018781-000 <br />nd <br />WSB has reviewed the preliminary plans for the Lake Amelia Woods 2 Addition development in <br />Lino Lakes, MN, prepared by Civil Methods, Inc., originally received on August 7, 2025. These <br />comments are based on the preliminary plat documents and the following final plan sets and plat <br />documents: <br />Preliminary Plans for the Lake Amelia Woods prepared by Civil Methods, Inc., dated <br />August 7, 2025, received August 7, 2025 <br />nd <br />Preliminary Plat of Lake Amelia Woods 2 Addition prepared by Acre Land Surveying, <br />dated August 7, 2025, received August 7, 2025. <br />nd <br />Draft Final Plat of Lake Amelia Woods 2 Addition prepared by Acre Land Surveying, not <br />dated, received August 7, 2025. <br />Applicant to respond to these comments in writing. Any changes to the plans that are not <br />associated with these comments shall be identified by either a summary in the response or in the <br />plans with a revision cloud or note. <br />st <br />PREVIOUS LAKE AMELIA 1 ADDITION COMMENTS <br />Civil Methods, Inc. responses to the September 1, 2021, memo shown in blue. <br />WSB 10/6/2021 responses and comments are shown in red. <br />Civil Methods, Inc. responses to the October 6, 2021, memo shown in green. <br />WSB 1/5/2022 responses and comments are shown in orange. <br />Civil Methods, Inc. responses to the January 5, 2022, memo shown in purple. <br />WSB 6/17/2022, WSB does not have any new comments or comments that need to be <br />addressed prior to final plat approval <br />nd <br /> CURRENT LAKE AMELIA 2 ADDITION COMMENTS <br />WSB 9/3/2025 new comments are shown in magenta. <br />Engineering <br />•General <br />The Lake Amelia Woods preliminary plat proposes to create four 10-acre parcels for single <br />thth <br />family homes along 20 Avenue (CSAH 54) in place of two existing parcels: 6149 20 Ave <br />and the parcel immediately to the north (PID 35-31-22-13-0004). All of the proposed parcels <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.