My WebLink
|
Help
|
About
|
Sign Out
Home
Search
09/10/2025 PZ Combined Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2025
>
09/10/2025 PZ Combined Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2025 3:04:44 PM
Creation date
9/5/2025 3:04:35 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
09/10/2025
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a.After staff review and approval of the revised PUD Preliminary Plan/Preliminary <br />Plant, the applicant shall resubmit the PUD Final Plan/Final Plat for the first <br />phase of development. The PUD Final Plan/Final Plat shall match the revised PUD <br />Preliminary Plan/Preliminary Plat. <br />b.All lot lines shall be a solid line. <br />7.Preliminary Plat Plan Set revision date August 25, 2025: <br />a.Sheet A0-12, Land Use & Density Plan: <br />i.Clean up Revision Schedule dates <br />b.Sheet A0-16, Preliminary Plat: <br />i.A drainage and utility easement is required over the stormwater facility <br />in Outlot D. The easement can be placed over the entire outlot. <br />ii.B1 L6 and B2 L7 shall be changed back to outlots, not lots. <br />c.Sheets E1-01 to E1-06 shall be updated to include the revised plans provided in <br />the PUD Final Plat set. <br />i.Exterior lighting on the multi-family buildings shall be included. <br />ii.Each light fixture on cut sheets shall be labeled to match table labels. <br />8.Design Guidelines and Statement of Intent: <br />a.Correct the Architectural Standards spreadsheets per August 26, 2025 email. <br />9.Wilkinson Waters Addition Final Plat: <br />a.A drainage and utility easement is required over the stormwater facility in Outlot <br />D. The easement can be placed over the entire outlot. <br />10.Final Plat Plan revision date August 25, 2025: <br />a.The plan sheets shall match the revised Preliminary Plat Plan Set for the first <br />phase of development. <br />b.For example, C3-10, Site Plan does not match the site plan in the Preliminary Plat <br />Plan Set. <br />ATTACHMENTS <br />1.Phasing Plan <br />2.Land Use Plan <br />3.Preliminary Plat <br />4.Final Plat <br />5.City Engineer Memo dated September 4, 2025 <br />6.Environmental Coordinator Memo dated September 3, 2025 <br />8 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.