Ms. Katie Larsen <br />09/04/2025 <br />Page 8 <br />•Sanitary Sewer <br />Sanitary sewer collection for the Wilkinson Waters Development is proposed to connect to <br />the existing assumed White Bear Lake Township infrastructure that is located across the <br />Rapp farmland in Lino Lakes. There is also an existing 18 inch sanitary sewer line located <br />at the intersection of Wilkinson Lake Blvd/CR J (81)/CSAH 21 that is believed to be owned <br />and maintained by White Bear Township as well and is planned to serve Lino Lakes sewer <br />district 4. This will require a Joint Powers Agreements between the developer North Oaks <br />Farms, White Bear Lake Township, and the Cities of North Oaks and Lino Lakes. Per the <br />Centerville Road Sanitary Sewer memo updated 4/22/21, the City of Lino Lakes service <br />district 4 has 354 GPM capacity reserved in the Centerville Road trunk line. <br />There is an additional lift station planned in the future to serve the remainder of district 4 <br />that will pump into the 18” line located at the intersection of Wilkinson Lake Blvd/CR J <br />(81)/CSAH 21. This forcemain can be drilled within City or County right of way in the <br />future. The 8 inch line that is being required to extend to Ash Street would only serve a <br />small localized area of sewer district 4. <br />The City would be open to extending the 18 inch through the site to serve as much of the <br />development as possible. However, due to depth, the senior apartments would still need <br />to be connected to the deeper 8 inch line as proposed. A future forcemain tie in to the 18 <br />inch would need to be accommodated. This will be further evaluated through the <br />preliminary plat process. <br />The site will otherwise be served by 8- inch diameter main along with various sized service <br />pipes being extended to each lot depending on its use. An additional sanitary sewer stub <br />will be extended to the north at Ash Street (CR 32) for future connections. <br />Current and future ownership and maintenance of all existing utility infrastructure will need to <br />be clarified between the developer, White Bear Lake Township, and the Cities of North Oaks <br />and Lino Lakes. Additionally calculations will need to be made for the increased flows to the <br />existing lift station in North Oaks and whether upgrading of the pumps will need to occur. <br />Comments: <br />1.Extend the existing 18" sanitary sewer stub outside the roadway into right of way as <br />shown in the attached redlines <br />ISG Response (7/14/2025)Sanitary sewer stub has been extended to the ROW <br />WSB Response/Comment (9/4/2025) Connection has been recently updated and is <br />under separate review <br />2.Provide minimum 1:1 easement for watermain outside the right of way (minimum 20' <br />centered on the utility) <br />a.The sanitary sewer between Lots 3 and 4 Block 1 would require a 40’ total <br />easement <br />ISG Response (7/14/2025)Easement lines have been updated to provide 20’ <br />minimum or 1:1 easement for sanitary sewer outside of the ROW <br />WSB Response/Comment (9/4/2025) Complete <br />3.Extend utilities a minimum 10' past the storm sewer at the Ash Street intersection <br />ISG Response (7/14/2025)Utility stubs have been extended past the culvert at the <br />Ash Street intersection <br />WSB Response/Comment (9/4/2025) Complete <br />Wilkinson Waters Development - Engineering Review <br /> <br />