My WebLink
|
Help
|
About
|
Sign Out
Home
Search
09/10/2025 PZ Combined Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2025
>
09/10/2025 PZ Combined Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2025 3:04:44 PM
Creation date
9/5/2025 3:04:35 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
09/10/2025
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Katie Larsen <br />09/04/2025 <br />Page 9 <br />4.Maintain sanitary sewer manholes on road centerlines <br />ISG Response (7/14/2025)Sanitary sewer manholes are maintained on the roadway <br />centerline. Sanitary manholes are placed adjacent to the median to avoid conflicts <br />with tree planting within median <br />WSB Response/Comment (9/4/2025) Shift sanitary manholes to median or to <br />center of drive lanes <br />5.Applicant to verify existing Lift Station has capacity for proposed project <br />ISG Response (7/14/2025)Noted, Sanitary Sewer Lift Station Memo has been <br />Submitted <br />WSB Response/Comment (9/4/2025) Address previous comments and revise Lift <br />Station Memo <br />6.WSB Response/Comment (9/4/2025) <br />•Transportation <br />Ensure City parking space requirements are met and ADA spaces are all marked on the <br />site plan. Townhouses project with 8+ units require guest parking at a rate of 1 space per <br />3 units. <br />Include lighting unit type and mounting on the Photometric Plan. <br />WSB Response (8/6/2025) – Comment addressed <br />Trails and sidewalks <br />Show the sidewalk/trail connection at the Ash Street and Wilkinson Way intersection. <br />WSB Response (8/6/2025) – Comment addressed <br />Comments: <br />1.See comments provided on the Wilkinson Waters TIS, major comments include: <br />a.Review trip generation <br />b.Verify most recent site plan is incorporated into the study <br />c.Forecast traffic on Wilkinson Way <br />d.Review trip distribution and turning movement exhibits, volumes are missing <br />e.Revise LOS and turn lane analysis based on revised turning movement <br />calculations <br />ISG Response (7/14/2025) - All comments have been addressed and revised in <br />the modified and finalized TIS <br />WSB Response (8/6/2025) – Provide updated TIS <br />WSB Response (9/4/2025) – Updated TIS has been provided, see comments on <br />the PDF. <br />2.The intersection at Wilkinson Way and Ash St/CR 32 will need to be right in right out <br />a.Coordinate turn lane plans with Anoka County <br />ISG Response (7/14/2025) - Noted, The access to Ash Street has been updated <br />to be a right in/right out. A turn lane on Ash Street has been added to the site <br />plans) <br />Wilkinson Waters Development - Engineering Review <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.