Laserfiche WebLink
Ms. Katie Larsen <br />08/06/2025 <br />Page 2 <br />Nature Refuge North Addition Engineering Review <br />Comments: <br />1. Show EOF elevations , locations, and routes for all low points in the paved and green <br />spaces. <br />Carlson (4/25/2025) EOF’s have been added to all low points and ponds. <br />WSB (5/23/2025) Verify proposed EOFs where elevations are undetermined or <br />where drainage may overflow in multiple directions (see plan comments) <br />Carlson (6/6/2025) See additional regional EOF exhibit attached. The limiting factor <br />for EOF will be the existing home to the north at approximately 906.5 <br />WSB (6/25/2025) Complete <br /> <br /> <br />a. EOF elevations must meet minimum freeboard requirements with building <br />lowest opening elevations (LOEs) <br />Carlson (4/25/2025) EOF’s elevation have been verified to meet freeboard <br />requirements. <br />WSB (5/23/2025) Discuss freeboard requirements for Lot 168 (LO/WO) <br />Carlson (6/6/2025) Rear of pad drains towards Pond 600. The northern side <br />of the house is shown to drain towards the CBMH. The elevation of the north <br />side of the house should remain above 10.0 to maintain freeboard. The <br />portion of the house that is further south and drains towards Pond 600 should <br />remain above 07.5 to maintain freeboard. <br />WSB (6/25/2025) Complete - ‘side berm’ will need to be extended such that <br />overflow drainage from the CB goes over the 09.0 EOF without going <br />towards the swale by the house <br /> <br /> <br />2. WSB (5/23/2025) Describe removing the existing retaining wall and coordinating <br />grading and restoration with the adjacent property owner east of Lot 101 <br />Carlson (6/6/2025) All coordination with the existing homeowner to be done by M/I <br />Homes. Easement is in place to fill along the side of their house and match front <br />yards and back yards. Homeowner to be notified prior to any work being done on <br />their property. Overall, this will provide a better yard for both the existing home and <br />new home. <br />WSB (6/25/2025) Complete – To be addressed with future plans and Lot 1 Block 1 <br />building permit <br /> <br />3. WSB (5/23/2025) Label all high points (particularly between lots along side lot lines – <br />some missing) <br />Carlson (6/6/2025) Added. <br />WSB (6/25/2025) Complete <br /> <br />• Stormwater Management <br /> <br />Stormwater management for the Natures Refuge North Addition consists of storm sewer <br />draining streets and yards, two sedimentation basins, and a large basin excavated for fill <br />material. The stormwater systems shall meet the City’s and Rice Creek Watershed District’s <br />(RCWD) Stormwater Management requirements. All proposed future public streets must <br />meet City design standards. Existing and proposed discharge rates are summarized below. <br />Pre- and Post- Development Discharge Rates (cfs) <br />Condition 2-Year 10-Year 100-Year 10-Day Snowmelt <br />Page 108 of 168