My WebLink
|
Help
|
About
|
Sign Out
Home
Search
09-08-25 - City Council Agenda
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2025
>
Searchable Packets
>
09-08-25 - City Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2025 10:41:23 AM
Creation date
9/22/2025 3:58:48 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
09/08/2025
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Katie Larsen <br />8/6/2025 <br />Page 4 <br />Clearwater Commons – Engineering Review <br />WSB (8/6/2025) Complete <br /> <br />2. Adjust SAN MH 1-6 location such that angles are at or greater than 90 degrees <br />a. Avoid placing in proposed wheel paths <br />BPA (7/7/2025) This MH has been adjusted to get the 90 degree connection <br />and be in the middle of the right drive lane. <br />WSB (8/6/2025) Complete <br /> <br />b. Better clarify (provide detail) how the proposed 3’+ drop will be achieved <br />BPA (7/7/2025) Now a small 1 foot drop is proposed, which can utilize the <br />existing detail. <br />WSB (8/6/2025) Complete` <br /> <br />3. Consider 6" (instead of 4”) diameter services for Lots 1& 2 for future flexibility of <br />commercial tenants <br />BPA (7/7/2025) 6” services are now proposed <br />WSB (8/6/2025) Complete <br /> <br />4. DOLI typically requires minimum 2.00% slope with service pipes less than 8" <br />BPA (7/7/2025) These services are now 2%. <br />WSB (8/6/2025) Complete <br /> <br />5. WSB (8/6/2025) Sanitary sewer manhole/castings close to proposed curb line <br />a. Sanitary sewer structures should be shifted to the roadway centerline <br />b. Maintain 10’ horizontal separation from watermain <br /> <br /> <br />• Transportation <br /> <br />The current Clearwater Commons development proposes extending an access road to <br />the east from the existing entrance at 21st Avenue and extending to the eastern <br />development limits. A second access road is proposed to be teed from the first access <br />road to the north to connect to Michaud Way. A traffic study and analysis was conducted <br />for the overall development and all redline comments have been addressed. <br /> <br />Comments: <br /> <br />1. A right-in right-out access is required at the intersection of the access road with 21st <br />Avenue <br />a. A median (porkchop) at the intersection will be required to direct traffic <br />BPA (7/7/2025) A median is now incorporated at the entrance. A Right only <br />sign is also included. <br />WSB (8/6/2025) See Figure 6-2.9 in the MnDOT Traffic Engineering Manual <br />for required regulatory signage and general pork chop shape at right-in/right- <br />out intersections. <br /> <br />2. The submitted Traffic Impact Study is in the process of being reviewed and additional <br />comments will be forthcoming. <br />BPA (7/7/2025) See revised Traffic Study and Comment Response letter. <br />WSB (8/6/2025) All comments have been addressed. <br /> <br />3. Provide specific typical sections for access roads <br />a. Note proposed road crown or cross drainage. <br />Page 161 of 168
The URL can be used to link to this page
Your browser does not support the video tag.