Laserfiche WebLink
Natures Refuge North <br />Development Agreement <br />September 8, 2025 <br /> page 3 <br />ii. The street right-of-way, storm water storage ponds, and surface water <br />drainage ways shall be graded prior to commencement of utility <br />construction. Four inches of topsoil and a City approved seed mix shall be <br />installed within disturbed areas, and seed mix information shall be <br />provided to the City. Surface water management systems shall be <br />maintained by the Developer until they are accepted by the City. <br />iii. The Developer shall be responsible for ascertaining that site geotechnical <br />and groundwater conditions are adequate and conforming with the <br />grading and site improvement as proposed. The Developer shall provide <br />testing from an approved testing company. <br />iv. The Developer’s engineer shall certify in writing, with an as-built survey, <br />that all grading complies with the approved grading plan prior to issuance <br />of any building permits. <br />v. The Developer shall promptly clear dirt and debris within public rights-of- <br />way and drainage and utility easements resulting from construction by <br />the Developer, its purchasers, builders and contractors within five (5) <br />days after notification by the City. The Developer shall be responsible for <br />all necessary street and storm sewer maintenance, including street <br />sweeping, until all home construction is completed, unless otherwise <br />released by the City. Warning signs shall be placed when hazards <br />develop in streets to prevent the public from traveling on them, including <br />detour signs if necessary. If and when the streets become impassable, <br />such streets shall be barricaded and closed. The Developer shall maintain <br />a smooth, hard driving surface and adequate drainage on all temporary <br />streets. If the Developer choses to have the City snow plow the streets <br />before the wear course is installed and in order to provide access to the <br />Development area, the Developer shall be responsible for damage such <br />as curb and gutter replacement caused by the City’s snow removal <br />process. <br />c. Final street grading, subbase, gravel base, concrete curb and gutter, and <br />bituminous base and wear course, street signs and striping shall be furnished <br />and installed. <br />d. Sidewalks, trails and street lighting shall be installed within 6 months of the <br />bituminous base course. Extensions may be approved by the City Engineer, due <br />to weather conditions, upon receipt of a written request in writing by the <br />Developer to the City. In no case shall such extension extend beyond one year <br />from the date of installation of bituminous base course. The Developer shall be <br />responsible for sidewalk damage until the project is accepted by the City and <br />escrow balances are returned. <br />Page 84 of 168