Laserfiche WebLink
SYMBOLS <br />101 DOOR TAG <br />BUILDING SECTION <br />WALL SECTION <br />DETAIL SECTION <br />ENLARGED PLAN <br />NEW DOOR <br />EXISTING DOOR <br />1 <br />REVISION <br />REVISION DELTA <br />0 GRID LINE <br />EXTERIOR ELEVATION <br />INTERIOR ELEVATION1 <br />A101 <br />Name <br />Elevation <br />LEVEL <br />1t WINDOW / STOREFRONT / CURTAINWALL <br />TYPE <br />WALL TYPE1i <br />1 1i <br /># <br />KEY NOTE <br />Room Name <br />101 ROOM <br /># <br />1 <br />A101 <br />SIM <br />0 <br />1 <br />A101 <br />SIM <br />PROJECT NAME: <br />PROJECT DESCRIPTION <br />LINO LAKES DEALERSHIP + OFFICES <br />PROJECT DESCRIPTION:NEW 8,410 SF SINGLE STORY "B" OCCUPANCY BUILDING <br />USING TYPE VB CONSTRUCTION. PROJECT DELIVERY <br />IS DESIGN-BUILD MEP BY THE GENERAL CONTRACTOR <br />ADDRESS:7920 LAKE DRIVE, LINO LAKES, MN 55014 <br />PID:ANOKA COUNTY, PID 09-21-22-22-0030 <br />PROPOSED USE:"B" (OFFICE) <br />BUILDING HEIGHT:1 STORY <br />BUILDING AREA:8,410 GFA <br />FIRE PROTECTION:FULL BUILDING SPRINKLER <br />*REFER TO SHEET A001 FOR MORE EXTENSIVE CODE REVIEW <br />CLIENT <br />PROJECT TEAM <br />TYLER HUEBSCH <br />10731 HAWTHORN TRAIL <br />WOODBURY, MN 55129 <br />CONTACT: TYLER HUEBSCH <br />EMAIL: TJHUEBSCH@GMAIL.COM <br />PHONE: 651-442-9334 <br />GENERAL CONTRACTOR <br />CLASSIC CONSTRUCTION <br />18542 ULYSSES ST NE <br />EAST BETHEL, MN 55011 <br />CONTACT: BRIAN LARSON <br />EMAIL: BRIAN@CLASSICCONSTRUCTIONINC.COM <br />PHONE: 763-434-8870 <br />ARCHITECT CIVIL ENGINEER <br />LANDSCAPE ENGINEER <br />MECHANICAL/ELECTRICAL/PLUMBING <br />THIS PROJECT IS BEING DELIVERED AS DESIGN BUILD MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE <br />SUPRESSION BY THE GENERAL CONTRACTOR UNDER A SEPARA TE SUBMTITTAL(S) <br />CALYX DESIGN GROUP <br />475 CLEVELAND AVE N, SUITE 101A <br />ST. PAUL, MN 55104 <br />CONTACT: BEN HARTBERG <br />EMAIL: BEN@CALYXDESIGNGROUP.COM <br />PHONE: 651-788-9018 <br />THIELEN & GREEN <br />7455 VILLAGE DRIVE, SUITE #110 <br />LINO LAKES, MINNESOTA 55038 <br />CONTACT: KRIS THIELEN - ARCHITECT (MN #59237) <br />EMAIL: KMT@TANDGARCH.COM <br />PHONE: 763-553-7927 <br />PLOWE ENGINEERING <br />6776 LAKE DR NE <br />LINO LAKES, MN 55014 <br />CONTACT: MOHAMMAD ABUGHAZLEH <br />EMAIL: MOE@PLOWE.COM <br />PHONE: 651-361-8237 <br />STRUCTURAL ENGINEER <br />HERZOG ENGINEERING LLC <br />530 N 3RD STREET, SUITE 230 <br />MINNEAPOLIS, MN 55401 <br />CONTACT: JOSHUA HERZOG, PE <br />EMAIL: JOSH@HERZOGENGINEERING.COM <br />PHONE: 612-200-9510 <br />GENERAL FIRE DEPT NOTES <br />1. ALL LIFE SAFETY SYSTEMS SHALL BE DESIGNED PER APPLICABLE FIRE PREVENTION CODE - <br />SEE LIFE SAFETY PLAN <br />2. FIE EXTINGUISHER REQUIREMENTS SHELL BE AS DETERMINED BY FIELD INSPECTION AND <br />NFPA 10. THE CONTRACTOR SHALL SUPPLY ALL FIRE EXTINGUISHERS AND CABINETS AS <br />REQUIRED - SEE LIFE SAFETY PLAN FOR SUGGESTED LOCATION(S) <br />3. BUILDING ADDRESS NUMBERS SHALL BE PROVIDED ON THE FRONT OF THE BUILDING AND <br />SHALL BE VISIBLE / LEGIBLE FROM THE PUBLIC RIGHT-OF-WAY, SAID NUMBERS SHALL <br />CONTRAST VISUALLY WITH THEIR BACKGROUND. ADDRESS NUMBERS SHALL BE PROVIDED <br />BY THE GENERAL CONTRACTOR <br />4. COMMERCIAL DUMPSTERS OR CONTAINERS WITH A CAPACITY OF ONE-AND-ONE-HALF CUBIC <br />YARDS OR GREATER SHALL NOT BE STORED OR PLACED WITHIN FIVE FEET OF COMBUSTIBLE <br />WALLS, OPENINGS, OR ROOF EAVE LINES UNLESS THESE AREAS ARE PROTECTED BY AN <br />APPROVED AUTOMATIC FIRE SPRINKLER SYSTEM <br />5. POST "NO PARKING -FIRE LANE" SIGNS ALONG VEHICULAR ACCESS ROADS <br />NOTES TO BIDDERS <br />AS REQUIRED BY CHAPTER 1341.0030 IEBC SECTION 305, ACCESSIBILITY FOR EXISITING <br />BUILDINGS, SECTION 305.7 ALTERATIONS AFFECTING AN AREA CONTAINING A PRIMARY <br />FUNCTION, PROVIDE SEPARATE LINE ITEMS FOR THE SCOPE OF WORK PERTAINING TO <br />THE FOLLOWING IMPROVEMENTS TO THE ACCESSIBLE ROUTE: <br />1. PARKING FACILITIES <br />2. ACCESSIBLE ENTRANCES <br />3. ACCESSIBLE ROUTE TO THE PRIMARY FUNCTION AREA <br />4. TOILET FACILITIES <br />5. DRINKING FOUNTAINS <br />305.7 ALTERATIONS AFFECTING AS AN AREA CONTAINING A PRIMARY FUNCTION. <br />WHERE AN ALTERATION AFFECTS THE ACCESSIBILITY TO OR CONTAINS AN AREA OF PRIMARY FUNCTION, <br />THE ROUTE TO THE PRIMARY FUNCTION SHALL INCLUDE TOILET FACILITIES, PARKING FACILITIES, AND <br />DRINKING FOUNTAINS SERVING THE AREA OF PRIMARY FUNCTION. <br />EXCEPTIONS: <br />1. THE COSTS OF PROVIDING THE ACCESSIBLE ROUTE AREA NOT REQUIRED TO EXCEED 20 <br />PERCENT OF THE COSTS OF THE ALTERATION AFFECTING THE AREA OF PRIMARY FUNCTION. <br />2. THIS PROVISION DOES NOT APPLY TO ALTERATIONS LIMITED SOLELY TO WINDOWS, HARDWARE, <br />OPERATING CONTROLS, ELECTRICAL OUTLETS, AND SIGNS. <br />3. THIS PROVISION DOES NOT APPLY TO ALTERATIONS LIMITED SOLELY TO MECHANICAL SYSTEMS, <br />ELECTRICAL SYSTEMS, INSTALLATION OR ALTERNATION OF FIRE PROTECTION SYSTEMS, AND <br />ABATEMENT OF HAZARDOUS MATERIALS. <br />4. THIS PROVISION DOES NOT APPLY TO ALTERATIONS UNDERTAKEN FOR THE PRIMARY PURPOSE <br />OF INCREASING THE ACCESSIBILITY OF A FACILITY. <br />5. THIS PROVISION DOES NOT APPLY TO ALTERED AREAS LIMITED TO TYPE B DWELLING AND <br />SLEEPING UNITS. <br />6. THIS PROVISION DOES NOT APPLY TO ALTERATIONS UNDERTAKEN BY A TENANT WHERE THE <br />ACCESSIBLE ROUTE, TOILET FACILITIES, PARKING FACILI TIES, TELEPHONES, AND DRINKING <br />FOUNTAINS ARE OUTSIDE THE TENANT SPACE. <br />DEFERRED SUBMITTALS <br />THE FOLLOWING ITEMS WILL BE SUBMITTED AS DEFERRED SUBMITTALS BY THE <br />APPROPRIATE INSTALLING SUBCONTRACTOR OR VENDOR. FOR EACH DEFERRED <br />SUBMITTAL ITEM, THE SUBCONTRACTOR OR VENDOR SHALL FIRST SUBMIT SIGNED AND SEALED <br />ENGINEERED DRAWINGS AND CALCULATIONS TO THE ARCHITECT FOR REVIEW AND APPROVAL PRIOR TO <br />SUBMITTAL TO THE BUILDING OFFICIAL OR FIRE MARSHAL. ARCHITECT’S REVIEW WILL BE FOR GENERAL <br />CONFORMANCE WITH THE BUILDING DESIGN ONLY. SUBCONTRACTOR OR VENDOR SHALL BE <br />RESPONSIBLE FOR DETERMINING SUBMITTAL REQUIREMENTS AND PAYMENT OF ALL FEES FOR <br />SUBMITTALS. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR COORDINATING THE TIMING OF <br />SUBMITTALS SO AS TO NOT INTERFERE WITH OVERALL CONSTRUCTION SCHEDULE, ALLOWING TIME FOR <br />APPROPRIATE REVIEWS FOR ARCHITECT AND BUILDING OFFICIAL OR FIRE MARSHAL. NO DELAYS OR TIME <br />EXTENSIONS WILL BE ALLOWED FOR FAILURE TO ALLOW APPROPRIATE TIME FOR REVIEW. <br />1. FIRE SPRINKLER SYSTEMS <br />2. FIRE ALARM SYSTEMS (IF REQUIRED) <br />3. MECHANICAL, ELECTRICAL, AND PLUMBING ENGINEERING <br />4. IT, LOW-VOLTAGE, AV, DATA, SECURITY <br />5. SIGNAGE (INTERIOR AND/OR EXTERIOR) <br />GENERAL NOTES <br />1. IT IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR AND THEIR SUB-CONTRACTORS, <br />MATERIAL SUPPLIERS, AND/OR THEIR CONSULTANTS TO REVIEW THE CONTRACT <br />DOCUMENTS IN ITS ENTIRETY. <br />2. ITEMS SHOWN IN ONE LOCATION IN THE DRAWINGS AND/OR INCLUDED IN THE <br />SPECIFICATIONS SHALL BE CONSIDERED PART OF THE WORK AND SHALL APPLY AT SIMILAR <br />LOCATIONS THROUGHOUT THE PROJECT. IN THE EVENT OF INCONSISTENCIES BETWEEN THE <br />DRAWINGS PROVIDED THE GENERAL CONTRACTOR SHALL SEEK CLARIFICATION FROM THE <br />ARCHITECT OF RECORD. <br />3. NO DEVIATIONS FROM THE CONTRACT DOCUMENTS, INCLUDING SPECIFICATIONS, SHALL BE <br />MADE WITHOUT WRITTEN APPROVAL FROM THE OWNER AND/OR ARCHITECT. <br />4. DO NOT SCALE DRAWINGS. <br />5. GENERAL CONTRACTOR AND/OR SUB-CONTRACTORS ARE REQUIRED TO VERIFY ALL <br />CONDITIONS PRIOR TO COMMENCING WORK. <br />6. IT IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR TO CONFIRM WITH THE OWNER <br />AND/OR LANDLORD ANY PROJECT REQUIREMENTS PRIOR TO BIDDING WORK INCLUDING: <br />PRE-APPROVED SUBCONTRACTORS, MATERIALS, CONSTRUCTION REQUIREMENTS, ETC. <br />7. THE GENERAL CONTRACTOR SHALL NOTIFY ARCHITECT IN WRITING ANY DISCREPANCIES, <br />ERRORS AND/OR OMISSIONS PRIOR TO STARTING THAT PORTION OF WORK IN A TIMELY <br />MATTER TO ALLOW REVIEW BY AOR AND OWNER FOR RESPONSE. NO WORK IS TO OCCUR IN <br />AREA OF CONFLICT UNTIL WRITTEN RESPONSE AND APPROVAL IS ACHIEVED BY ALL PARTIES <br />(OWNER, ARCHITECT, GENERAL CONTRACTOR). <br />8. THE GENERAL CONTRACTOR IS TO NOTIFY ARCHITECT AND OWNER IMMEDIATELY ANY <br />HAZARDOUS SUBSTANCES ENCOUNTERED IN THE FIELD. <br />9. ALL WORK SHALL BE PERFORMED BY APPROPRIATE SKILLED PERSONALE AND MATERIALS <br />USED SHALL BE OF FIRST QUALITY. <br />10. THE GENERAL CONTRACTOR IS RESPONSIBLE TO PROTECT THE EXISTING STRUCTURE, <br />FINISHES, LANDSCAPING, MEP SYSTEMS UNLESS REQUIRED TO REMOVE OR REPLACE AS <br />SPECIFIED IN THE CONSTRUCTION DOCUMENTS <br />11. WATER RESISTANT GYP. BD. SHALL BE USED AT ALL WET LOCATIONS <br />12. ALL EXISTING WALLS AND/OR FENESTRATION ARE TO REMAIN U.N.O. <br />13. IF REQUIRED, THE GENERAL CONTRACTOR SHALL PREPARE FIRE SPRINKLER DESIGN <br />DRAWINGS, SUBMIT AND RECEIVE APPROVAL PRIOR TO INSTALLATION AS REQUIRED WITH <br />THE LOCAL AGENCIES HAVING JURISDICTION ON THIS PROJECT. THE AUTOMATIC SPRINKLER <br />SYSTEM MUST BE INSTALLED IN ACCORDANCE WITH THE CODES LISTED BELOW AND LOCAL <br />AMENDMENTS. A SEPARATE PERMIT BY DESIGN BUILD ENGINEERING COORDINATED BY THE <br />GENERAL CONTRACTOR IS REQUIRED TO BE SUBMITTED TO THE AUTHORITY HAVING <br />JURISDICTION FOR APPROVAL. <br />14. THE GENERAL CONTRACTOR SHALL PROVIDE ADEQUATE BLOCKING AS DIRECTED BY THE <br />MANUFACTURER FOR ALL WALL MOUNTED EQUIPMENT OR DEVICES, AND SHALL <br />COORDINATE WITH THE OWNER'S REPRESENTATIVE FOR ALL ITEMS NOTED AS "BY OWNER" <br />OR "BY OTHERS". <br />15. DRAWINGS WERE PREPARED USING PRODUCT SPECIFIC CONFIGURATION INFORMATION, <br />ACTUAL DIMENSIONS AND DETAILS OF SELECTED MATERIALS MAY CHANGE BEFORE <br />INCORPORATION INTO THE WORK. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR <br />ACCOMMODATING ANY CHANGES TO OTHER MATERIALS THAT ARE NECESSARY BECAUSE OF <br />THESE DIFFERENCES. <br />16. TYPICAL AND PROJECT SPECIFIC DETAILS ARE INCLUDED IN THE DRAWINGS, WHERE DETAILS <br />OR DESIGN INTENT CANNOT BE DETERMINED SEEK CLARIFICATION PRIOR TO COMMENCING <br />WORK <br />17. ALL WORK SHALL CONFORM TO LAWS, REGULATIONS, CODES AND ORDINANCES OF FEDERAL, <br />STATE, COUNTY, CITY OR ANY OTHER JURISDICTION AS EACH MAY APPLY. IN THE EVENT OF <br />ANY CONFLICT BETWEEN ANY OF THE PROJECT REQUIREMENTS, THE MOST STRINGENT <br />REQUIREMENT SHALL GOVERN <br />18. EXITS, EXIT SIGNS, FIRE ALARM PANELS, HOSE CABINETS, FIRE EXTINGUISHERS LOCATIONS <br />AND STANDPIPE CONNECTIONS, AS APPLICABLE, SHALL NOT BE CONCEALED BY CURTAINS, <br />MIRRORS, OR OTHER DECORATIVE MATERIAL <br />19. ALL EXIT DOORS SHALL BE READILY OPENABLE FROM THE EGRESS SIDE WITHOUT THE USE <br />OF A KEY OR SPECIAL KNOWLEDGE OR EFFORT <br />20. REFER TO INDIVIDUAL SHEETS FOR OTHER GENERAL NO TES SPECIFIC TO THAT SECTION <br />TRUE NORTH <br />PLAN NORTH <br />PROJECT LOCATION <br />LOCATION MAP <br />TRUE NORTH <br />PLAN NORTH <br />PROJECT LOCATION <br />KEY PLAN <br />ACT ACOUSTIC CEILING TILE <br />ADJ ADJACENT <br />BD BOARD <br />BO BOTTOM OF <br />BM BEAM <br />CL CENTER LENE <br />CLG CEILING <br />CMU CONCRETE MASONRY UNIT <br />COL COLUMN <br />CONC CONCRETE <br />DIM DIMENSION <br />EQ EQ <br />EXIST EXISTING <br />FLR FLOOR <br />FO FACE OF <br />FP FILLER PANEL <br />GYP BD GYPSUM BOARD <br />HT HEIGHT <br />INSUL INSULATION <br />MAX MAXIMUM <br />MIN MINIMUM <br />NIC NOT IN CONTRACT <br />NTS NOT TO SCALE <br />OC ON CENTER <br />PLY WD PLYWOOD <br />PT PRESSURE TREATED <br />PTD PAINTED <br />RO ROUGH OPENING <br />TBD TO BE DETERMINED <br />TYP TYPICAL <br />UNO UNLESS NOTED OTHERWISE <br />VIF VERIFY IN FIELD <br />W/ WITH <br />WD WOOD <br />ABBREVIATIONS <br />OWNER ACKNOWLEDGEMENT <br />THIELEN & GREEN REQUIRES APPROVAL OF THE FOLLOWING PERMIT DOCUMENTS PRIOR TO <br />SUBMITTING FOR CITY PLAN REVIEW. PLEASE REVIEW THE PERMIT DOCUMENTS IN FULL AND MAKE <br />NOTE OF ANY ADDITIONAL CHANGES THAT SHOULD BE ADDRESSED. AN AUTHORIZED SIGNATURE BELOW <br />INDICATES THE APPROVAL OF THIS DESIGN AND AUTHORIZES THIELEN & GREEN TO PROCEED WITH THE <br />PERMITTING PROCESS AS OUTLINE IN THE CONTRACT AGREEMENT. <br />X <br />CLIENT NAME DATE <br />7 <br />g000 <br />7 <br />g000 <br />8 <br />g000 <br />9 <br />g000 <br />Scale <br />Date <br />Drawn By <br />Checked By <br />Project Number <br />ISSUE DATE <br />7455 VILLAGE DRIVE, SUITE #110 <br />LINO LAKES, MN 55014 <br />763-553-7927 <br />WWW.TANDGARCH.COM <br />CITY STAMP AREA <br />PRELIMINARY <br />NOT FOR CONSTRUCTION <br />10 <br />/ <br />2 <br />1 <br />/ <br />2 <br />0 <br />2 <br />5 <br /> <br />7 <br />: <br />2 <br />1 <br />: <br />0 <br />8 <br /> <br />A <br />M <br />As indicated <br />EX00 <br />COVER SHEET <br />KMT <br />AUTHOR <br />10/21/2025 <br />653_2025 <br />7 <br />9 <br />2 <br />0 <br /> <br />L <br />A <br />K <br />E <br /> <br />D <br />R <br />I <br />V <br />E <br />LI <br />N <br />O <br /> <br />L <br />A <br />K <br />E <br />S <br />, <br /> <br />M <br />N <br /> <br />5 <br />5 <br />0 <br />1 <br />4 <br />PI <br />D <br /> <br />0 <br />9 <br />- <br />2 <br />1 <br />- <br />2 <br />2 <br />- <br />2 <br />2 <br />- <br />0 <br />0 <br />3 <br />0 <br />EXHIBIT #1 <br />EXHIBIT #02 <br />P&Z SUBMITTAL <br />P&Z COMMENTS <br />06/23/2025 <br />06/23/2025 <br />08/07/2025 <br />10/21/2025 <br />LI <br />N <br />O <br /> <br />L <br />A <br />K <br />E <br />S <br />DE <br />A <br />L <br />E <br />R <br />S <br />H <br />I <br />P <br /> <br />+ <br />OF <br />F <br />I <br />C <br />E <br />S <br />SHEET INDEX <br />NUMBER SHEET NAME REVISION <br />_CONCEPTUAL <br />EX00 COVER SHEET <br />EX01 CONCEPTUAL SITE PLAN <br />EX02 CONCEPTUAL FLOOR PLAN <br />EX03 CONCEPTUAL ELEVATIONS <br />EX04 CONCEPTUAL RENDERINGS <br />EX05 SITE CROSS SECTION <br />DESIGN ALTERNATES <br />REVISION SCHEDULE <br />NO. DESCRIPTION DATE <br />LINO LAKES DEALERSHIP + OFFICES <br />7920 LAKE DRIVE, LINO LAKES, MN 55014 <br />DEFERRED SUBMITTALS <br />THE FOLLOWING ITEMS WILL BE SUBMITTED AS DEFERRED SUBMITTALS BY THE <br />APPROPRIATE INSTALLING SUBCONTRACTOR OR VENDOR. FOR EACH DEFERRED <br />SUBMITTAL ITEM, THE SUBCONTRACTOR OR VENDOR SHALL FIRST SUBMIT SIGNED AND SEALED <br />ENGINEERED DRAWINGS AND CALCULATIONS TO THE ARCHITECT FOR REVIEW AND APPROVAL PRIOR TO <br />SUBMITTAL TO THE BUILDING OFFICIAL OR FIRE MARSHAL. ARCHITECT’S REVIEW WILL BE FOR GENERAL <br />CONFORMANCE WITH THE BUILDING DESIGN ONLY. SUBCONTRACTOR OR VENDOR SHALL BE <br />RESPONSIBLE FOR DETERMINING SUBMITTAL REQUIREMENTS AND PAYMENT OF ALL FEES FOR <br />SUBMITTALS. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR COORDINATING THE TIMING OF <br />SUBMITTALS SO AS TO NOT INTERFERE WITH OVERALL CONSTRUCTION SCHEDULE, ALLOWING TIME FOR <br />APPROPRIATE REVIEWS FOR ARCHITECT AND BUILDING OFFICIAL OR FIRE MARSHAL. NO DELAYS OR TIME <br />EXTENSIONS WILL BE ALLOWED FOR FAILURE TO ALLOW APPROPRIATE TIME FOR REVIEW. <br />1. FIRE SPRINKLER SYSTEMS <br />2. FIRE ALARM SYSTEMS (IF REQUIRED) <br />3. MECHANICAL, ELECTRICAL, AND PLUMBING ENGINEERING <br />4. IT, LOW-VOLTAGE, AV, DATA, SECURITY <br />5. SIGNAGE (INTERIOR AND/OR EXTERIOR) <br />H <br />SHEET INDEX <br />NUMBER SHEET NAME REVISION <br />_CONCEPTUAL <br />EX00 COVER SHEET <br />EX01 CONCEPTUAL SITE PLAN <br />EX02 CONCEPTUAL FLOOR PLAN <br />EX03 CONCEPTUAL ELEVATIONS <br />EX04 CONCEPTUAL RENDERINGS <br />EX05 SITE CROSS SECTION <br />Page 27 of 406