Laserfiche WebLink
Ms. Katie Larsen <br />10/31/2025 <br />Page 6 <br />7920 Lake Drive – Lino Lakes Dealership – Engineering Review <br />• Wetlands and Mitigation Plan <br /> <br />Wetlands are not present. <br /> <br /> <br />• Landscaping <br /> <br />Specific landscaping plans were provided as part of the submittal and the City’s <br />Environmental Coordinator will review and provide in-depth comments. <br /> <br /> <br />• Floodplain <br /> <br />No floodplain on the site. <br /> <br /> <br />• Drainage and Utility Easements <br /> <br />Drainage and utility easements are required for stormwater systems. This includes the area <br />encompassing the 100-yr HWL of any BMPs. <br /> <br />Comments: <br />1. Provide 15' trail easement as shown <br />a. Grade area for future trail <br />Plowe (10/21/2025) Easement is shown. Future grading shown on Sheet <br />C2.2 <br />b. WSB (10/29/2025) Complete <br />. <br /> <br />• Development Agreement <br /> <br />A Development Agreement will not be required but a Site Performance Agreement will be. <br /> <br /> <br />• Grading Agreement <br /> <br />Grading agreement not required at this time. <br /> <br /> <br />• Stormwater Maintenance Agreement <br /> <br />The stormwater facilities will be privately maintained and a Declaration for Maintenance of <br />Stormwater Facilities will be required. Both the Rice Creek Watershed District (RCWD) and <br />the City of Lino Lakes shall be parties to the Declaration. <br /> <br /> <br />• Permits Required <br /> <br />1. NPDES General Construction Permit <br />2. City of Lino Lakes Zoning Permit for construction <br />3. Anoka County Highway/Right of Way Permit <br />Page 39 of 406