My WebLink
|
Help
|
About
|
Sign Out
Home
Search
11-24-25 - City Council Meeting Agenda
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2025
>
Searchable Packets
>
11-24-25 - City Council Meeting Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2025 9:18:00 AM
Creation date
12/4/2025 8:58:35 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
11/24/2025
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lino Lakes Dealership and Office Site Performance Agreement page 2 of 11 <br />not limited to: landscaping, private driveways, parking areas, <br />sanitary sewer extension, water system extension, storm drainage <br />systems, curbing, lighting, fencing, fire lanes, sidewalks, exterior <br />building architectural design and building elements, site grading <br />and erosion control measures. <br /> <br />Such improvements shall be completed in accordance with Section <br />V herein. <br /> <br />B. Cost Estimates. The Developer has provided the City with a written <br />estimate of all applicable costs of the On-Site Work, itemized by <br />type. The cost estimates have been reviewed by the City, and the <br />City has established the actual amount of the financial guarantee <br />as set forth below. The description and estimated cost of <br />Developer's On-Site Work are as follows: <br /> <br /> Description of Improvements Estimated <br />Costs <br />1. Lighting $ 36,300.00 <br />2. Fences / Screen Structures $ 5,060.00 <br />3. Trash Disposal Structures $ 15,000.00 <br />4. Curbing / Islands / Delineators $ 27,500.00 <br />5. Storm Drainage Systems / Sewers / Catch Basins <br />/ Culverts / Swales $ 30,820.00 <br />6. Public Trails and / or Sidewalk $ 0.00 <br />7. Private Trails and / or Sidewalk $ 9,315.00 <br />8. Driveway / Curb cut / Parking Lot / Fire Lane $ 108,450.00 <br />9. Water mains / Hydrants / Sanitary Sewers $ 22,884.00 <br />10. Landscaping $ 53,477.00 <br />11. Site Grading $ 77,856.00 <br />12. Erosion Control $ 4,880.00 <br /> Total Estimated Cost of Developer Improvements $ 391,542.00 <br /> Security Requirement (Total * 35%) $ 137,040.00 <br /> <br />III. OFF-SITE WORK - Not applicable. <br /> <br />IV. EASEMENTS/RIGHT OF WAY <br /> <br />A. The Developer is party to easements of record and a Declaration of <br />Easements, Covenants, Conditions and Restrictions concerning Lot 2, <br />Block 1, Pine Glen. <br /> <br />Page 57 of 406
The URL can be used to link to this page
Your browser does not support the video tag.