Laserfiche WebLink
Lino Lakes Dealership and Office Site Performance Agreement page 2 of 11 <br />not limited to: landscaping, private driveways, parking areas, <br />sanitary sewer extension, water system extension, storm drainage <br />systems, curbing, lighting, fencing, fire lanes, sidewalks, exterior <br />building architectural design and building elements, site grading <br />and erosion control measures. <br /> <br />Such improvements shall be completed in accordance with Section <br />V herein. <br /> <br />B. Cost Estimates. The Developer has provided the City with a written <br />estimate of all applicable costs of the On-Site Work, itemized by <br />type. The cost estimates have been reviewed by the City, and the <br />City has established the actual amount of the financial guarantee <br />as set forth below. The description and estimated cost of <br />Developer's On-Site Work are as follows: <br /> <br /> Description of Improvements Estimated <br />Costs <br />1. Lighting $ 36,300.00 <br />2. Fences / Screen Structures $ 5,060.00 <br />3. Trash Disposal Structures $ 15,000.00 <br />4. Curbing / Islands / Delineators $ 27,500.00 <br />5. Storm Drainage Systems / Sewers / Catch Basins <br />/ Culverts / Swales $ 30,820.00 <br />6. Public Trails and / or Sidewalk $ 0.00 <br />7. Private Trails and / or Sidewalk $ 9,315.00 <br />8. Driveway / Curb cut / Parking Lot / Fire Lane $ 108,450.00 <br />9. Water mains / Hydrants / Sanitary Sewers $ 22,884.00 <br />10. Landscaping $ 53,477.00 <br />11. Site Grading $ 77,856.00 <br />12. Erosion Control $ 4,880.00 <br /> Total Estimated Cost of Developer Improvements $ 391,542.00 <br /> Security Requirement (Total * 35%) $ 137,040.00 <br /> <br />III. OFF-SITE WORK - Not applicable. <br /> <br />IV. EASEMENTS/RIGHT OF WAY <br /> <br />A. The Developer is party to easements of record and a Declaration of <br />Easements, Covenants, Conditions and Restrictions concerning Lot 2, <br />Block 1, Pine Glen. <br /> <br />Page 57 of 406