My WebLink
|
Help
|
About
|
Sign Out
Home
Search
11-24-25 - City Council Meeting Agenda
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2025
>
Searchable Packets
>
11-24-25 - City Council Meeting Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2025 9:18:00 AM
Creation date
12/4/2025 8:58:35 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
11/24/2025
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lino Lakes Dealership and Office Site Performance Agreement page 4 of 11 <br />C. Surface Water Management Area Charges <br /> <br />Previously paid at the time of subdivision. <br /> <br /> Acre Fee <br />1. Sanitary Sewer Trunk Unit Fee ($1,801/unit; 2.92 <br />units/Acre) <br /> Paid <br />Previously <br />2. City Sewer Availability Fee ($1,686/SAC Unit) To be Paid <br />w/Building <br />Permit <br />3. Water Trunk Unit Fee ($2,588/unit; 2.92 units/Acre) Paid <br />Previously <br />4. City Water Availability Fee ($1,628/SAC Unit) To be Paid <br />w/Building <br />Permit <br />5. City Surface Water Management Fee ($/Acre) Paid <br />Previously <br /> Total Estimated (Budget) Developer Fees w/Building <br />Permit <br /> <br />D. Metropolitan Council Environmental Services (MCES) Sewer <br />Availability Charges (SAC) are in addition to the fees referenced <br />above and shall be determined by MCES, and shall be paid with <br />the Building Permit. <br /> <br />IV. RECORD DRAWINGS. <br /> <br />A. Upon project completion, Developer shall submit record drawings, <br />in electronic format, of all public and private infrastructure <br />improvements, including grading, sanitary sewer, water main, storm <br />sewer facilities, and roads, constructed by Developer. The as-built <br />survey must include, but is not limited to, proposed and final <br />contours with adequate elevation shots to show conformance, <br />property irons (to be exposed in field), low floor and low opening <br />elevations, and the 100-Year High Water Level (HWL) of all ponds, <br />lakes, and wetland areas. The files shall be drawn in Anoka County <br />NAD 83 Coordinate system and provided in both AutoCAD .dwg and <br />Adobe .pdf file formats. The plans shall include accurate locations, <br />dimensions, elevations, grades, slopes and all other pertinent <br />information concerning the complete work. The Developer shall also <br />submit certified compaction testing results for the site grading <br />operations. <br />B. A summary of the record plan attribute data for the storm sewer, <br />water main, and sanitary sewer structures and pipes shall be <br />Page 59 of 406
The URL can be used to link to this page
Your browser does not support the video tag.