My WebLink
|
Help
|
About
|
Sign Out
Home
Search
07/09/2012 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2012
>
07/09/2012 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2014 2:44:28 PM
Creation date
1/10/2014 8:32:23 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
07/09/2012
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
195
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST APPROACH — ROAD AND BRIDGE VALUES <br />Replacement Cost New <br />The cost new of the subject improvements, the roadway and bridge, were estimated by <br />contacting local public and private engineers, the MN DOT, and Marshall & Swift Estimators. <br />The most relevant data was obtained from Joe MacPherson, the MN DOT State Aid <br />Construction Engineer, Jim Bellefeuille at TKDA Engineers, Mark, the Lakeville City Engineer, <br />Greg Buchal at Larson Engineering, and Aaron Nelson, the Woodbury City Engineer. <br />The estimated replacement costs new are: <br />IMPROVEMENT UNIT COST UNITS COST NEW <br />Marshall & Swift <br />Grading & surplus disposal <br />4" rock base 0.68 65,847 $ 44,775.96 <br />4" asphalt 1.99 65,847 $ 131,035.53 <br />Concrete curb 6'' $ 10.30 4,314 $ 44,435.75 <br />Storm sewer $ 58.60 2,120 $ 124,232.00 <br />0.32 98,771 $ 31,606.56 <br />Total 4.79 27,356 $ 376,085.80 <br />City Engineers <br />Woodbury $ 160.00 <br />28 wide, concrete curb <br />Lakeville $ 185.00 2,120 $ 392,200.00 <br />32', curb, 1 concrete sidewalk <br />2,120 $ 339,200.00 <br />MN DOT <br />Long term components 88.50 2,120 $ 187,620.00 <br />Milling & paving 26.50 2,120 $ 56,180.00 <br />Total $ 243,800.00 <br />ROAD COST NEW CONCLUSION <br />350,000. <br />Bridge <br />Street Lights $ <br />Street signs <br />3,22500 <br />248.00 <br />391,000.00 <br />9,675.00 <br />248.00 <br />TOTAL COST NEW CONCLUSION <br />750,923.00 <br />WALKER APPRAISALS <br />
The URL can be used to link to this page
Your browser does not support the video tag.