Estimate of Roadway Cos New <br />Marshall and Swift estimates a road coristruction cost new of $376,086. This is stighty more <br />than the $339.200 estimted by the City of Woodbury. The City of Lakeville estimated a higher <br />cost of 5392.200, but this was based on a recent estimate for a slightly wider 32-foot road with a <br />sidewalk on one side. <br />The State Aid Engineer at the MN DOT said that their average statewide cost for a 28-foot road <br />with a surmountabe curb and storm sewer was $500,000 per mile, which averages $95 per <br />lineal foot, for a total of $243,800. The MN DOT cost is lower because it is based on a <br />statewide average. <br />In my opinion, the cost new of the subject roadway would be approximately $350'000. This is <br />between the estimates from Marshall & Swift and the City Engineers in Woodbury and Lakeville. <br />Bridge and Lighting Estimates <br />Jim Oellefeuille at TKDA estimated the bridge repacement cost at $336,000 for the construction <br />plus $55,000 for design and geo-technica work, for a total of $391.000. <br />The street tighting and signage nage costs are taken from MarshaU and Swift. <br />Depreciation <br />The MN DOT Engineer said that asphalt road surfaces are designed to last 25 years, though <br />limited street maintenance budgets force them to remain in use longer than that. He sad that <br />the road bed, storm sewer, and curb and gutter would typically last 50 years, He provided these <br />re-paving costs per mile: <br />Milling - $30,000 <br />Paving with asphalt -$110.DOU <br />Total - $140,000 per mile, or $26.50 per lineal foot (28% of total cost new) <br />The subjec property receives si nifinandyleaswuarandtoarthanapub|icnuadway- It is used <br />by only 5 homeowners and their guests. The homeowner's association has never used salt to <br />clear snow and ice off the road, which would greatly increase the expected life of the roadway. <br />Therefore, the life expectancy of the subject's roadway is estimated at 1.5 times the life ofa <br />public road — 75 years for the long term components and 38 years for the asphalt paving. The <br />subject roadway was constructed in 1993 and the homeowners have not re-paved it. They have <br />applied a surface treatment to prolong the life of the asphalt 4 years ago. <br />The depreciation on the subjec roadway is estimated at 25% for the long term components <br />(road bed, curb and gutter sewer) and 50% for the asphalt surface, based upon the 75-year <br />and 38-year life expectancies discussed previously. The asphalt surface component is <br />estimated at 28% of the total road cost, based on the MN DOT discussion previously. <br />The bridge depreciation is estimated at 30% because most of the structure is concrete, but the <br />asphalt surface will have a shorter lifespan, <br />The street lights are estimated to have a useful life of 75 years (25% depreciation), similar to the <br />road bed. The sign is estimated to have a useful life of 40 years (50% depreciation). <br />WALKER APPRAISALS 5 <br />