My WebLink
|
Help
|
About
|
Sign Out
Home
Search
01/10/2005 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2005
>
01/10/2005 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2014 2:10:03 PM
Creation date
1/15/2014 9:21:00 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
01/10/2005
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
$100,001.00 to $500,000.00 <br />$993.75 for the first $100,000.00 plus $5.60 for each <br />additional $1,000.00, or fraction thereof, to and <br />including $500,000.00 <br />$3,233.75 for the first $500,000.00 plus $4.75 for each <br />additional $1,000.00, or fraction thereof, to and <br />including $1,000,000.00 <br />$5,608.75 for the first $1,000,000.00 plus $3.15 for <br />each additional $1,000.00, or fraction thereof <br />00,001.00 to $1,000,000.00 <br />$1,000,001.00 and up <br />Other Inspections and Fees: <br />1. Inspections outside of normal business hours $47.00 per hour* <br />2. Reinspection fee $47.00 per trip <br />3. Erosion Control Reinspection fee $47.00 per trip <br />4. Inspections for which no fee is specifically designed $47.00 per trip <br />5. Additional plan review required by changes, additions, or revisions $47.00 per hour ** <br />6. For use of outside consultants for plan checking and inspections, or both Actual Cost * ** <br />7. Deck Permit Fee Permit fee table based <br />on $10.00 per square foot value <br />8. Basement Finish Permit Fee Permit fee table based <br />on $15.00 per square foot value <br />9. Underground Swimming Pool $141.00, plus state <br />ITsurcharge <br />O. Aboveground Swimming Pool $47.00, plus state <br />surcharge <br />11. Plan Review Fee <br />a. 65% of the Building Permit Fee <br />b. In instances where two (2) or more permits are issued for a residential structure, the plan review fee shall <br />be forty percent (40 %) per dwelling unit. <br />12. Escrow Fees <br />At the time of the final certificate of occupancy if the following items are not completed, an escrow in the <br />amount indicated will be taken. There are two options for entering into an escrow agreement with the City. <br />The escrow can be paid to the City and an agreement filled out and signed by the payee and City Official, or <br />the title company or lending institution can hold the escrow and fill out an agreement form stating they are the <br />responsible party for holding the funds for the uncompleted items. <br />c. Driveway - $1,000.00 <br />d. Exterior Concrete - $1,000.00 <br />e. Landscaping - $2,500.00 <br />f. As -built Surveys - $1,000.00 <br />g. Stucco (final coat only) - $1,000.00 <br />h. Garage Floor - $1,000.00 <br />i. There will be a $50.00 non - refundable administrative fee for escrow deposits <br />The only time these items can be uncompleted is during the winter months, except landscaping. A temporary <br />certificate of occupancy shall be issued and unfinished work must be completed within six (6) months <br />(weather permitting) after entering into the escrow agreement. <br />2 <br />-20D- <br />
The URL can be used to link to this page
Your browser does not support the video tag.