Laserfiche WebLink
13. Easement Encroachment Fee $30.00 <br />14. Fence Permit $47.00 <br />•15. Sign Permit Fee Table <br />16. All Residential Mechanical Permits, (except new construction and air conditioning $25.00 <br />17. Residential New Construction Mechanical Permit $60.00 <br />18. Residential Air Conditioning Permit 1% of the contract price ($25.00 minimum fee) <br />19. Commercial Mechanical Permit 1% of the contract price ($25.00 minimum fee) <br />20. Manufactured Home Permits $90.00 <br />21. Plumbing Permit $9.00 per fixture ($15.00 minimum fee) <br />22. Sewer Connection Fee $200.00 <br />23. Water Connection Fee $250.00 <br />24. Contractor License Verification $5.00 per permit <br />25. Contractor License $50.00 <br />26. SAC (Sewer Availability Charge) per Met Council <br />• 27. 3/" Water Meter $290.00 <br />28. 1" Water Meter $325.00 <br />29. MXU Unit $125.00 <br />30. Septic Installation or Repair Permit $150.00 <br />31. Septic Pumping Permit $5.00 <br />32. Demolition Permit $47.00 <br />*Inspections made out side of normal business hours is a three -hour minimum charge <br />* *Or the total hourly cost to the jurisdiction, whichever is greatest. This cost shall include supervision, <br />overhead, equipment, hourly wages, and fringe benefits of the employees involved. <br />** *Actual costs include administrative and overhead costs. <br />SIGN PERMIT - TEMPORARY <br />TOUCH PAD <br />CURB STOP COVERS <br />$25.00 /TERM <br />$20.00 <br />$68.00 <br />escrow may be required, as determined by the City Engineer, to cover all costs incurred by the City for plan <br />•*An <br />revision and construction observation. <br />3 <br />-20E- <br />