Laserfiche WebLink
TKDA <br />ENGINEERS • ARCHITECTS • PLANNERS <br />MEMORANDUM <br />1500 Piper Jaffray Plaza <br />444 Cedar Street <br />Saint Paul, MN 55101 -2140 <br />(651) 292-4400 <br />(651) 292 -0083 fax <br />www.tkda.com <br />To: James Studenski, City Engineer Reference: Turnberry Crossing <br />(Marshan Lake Townhomes <br />Copies To: 2nd Addition) <br />City of Lino Lakes, Minnesota <br />Comm. No. 13265 -002 <br />From: Scott A. Brink, P.E. Routing: <br />Date: January 31, 2005 <br />Engineering Reviews for this proposed development were previously prepared and presented in several <br />previous memorandums. In previous reviews, the proposed development was titled " Marshan Lake <br />Townhomes 2nd Addition." The project title has since been changed by the developer to "Turnberry <br />Crossing." <br />The following documents have been received since the September 2, 2004 review: <br />1. Construction Plans for Existing Conditions, Grading, Drainage and Erosion Control (full size and half <br />size) dated November 5, 2004 and received by the City of Lino Lakes December 28, 2004, by Schoell <br />and Madson, Inc. The Construction plans are as follows: <br />1) Cover Sheet <br />2) Existing Conditions <br />3) Tree Preservation Plan <br />4) Grading and Erosion Control Plan <br />5) Details <br />6) Stormwater Pollution Prevention Plan (Sheets 1 -4) <br />2. Construction Plans for Sanitary Sewer, Watermain, and Storm Sewer and Street Improvements (full <br />size and half size) dated November 5, 2004 and received by the City of Lino Lakes December 28, <br />2004, by Schoell and Madson, Inc. The Construction plans are as follows: <br />1) Cover Sheet <br />2) Drive A and Drive B Street Improvements <br />3) Drive C Street Improvements <br />4) Drive A and Drive B Utility improvements <br />5) Drive C and Watermain Improvements <br />6) Aqua Circle Watermain Improvements <br />7) Storm Sewer Improvements <br />8) Details <br />9) Details <br />