Laserfiche WebLink
• <br />Draft Draft 4 -18 -2005 Draft <br />PAVEMENT MANAGEMENT POLICIES <br />TABLE OF CONTENTS <br />I. PURPOSE 1 <br />II. ESTABLISHMENT OF RATING SYSTEM 1 <br />III. PAVEMENT MANAGEMENT CATEGORIES 1 <br />A. Street Reconstruction <br />B. Street Maintenance <br />IV. PROJECT SELECTION CRITERIA 2 <br />V. FINANCING 2 <br />VI. STORM WATER UTILITY 3 <br />VII. ASSESSMENTS 3 <br />VIII. MAXIMUM ASSESSMENT RATE 5 <br />• IX. TERM OF ASSESSMENTS 5 <br />X. INTEREST RATE ON ASSESSMENTS 6 <br />XI. CORNER LOTS 6 <br />XII. IRREGULARLY SHAPED LOTS 6 <br />XIII. LOT WIDTH 6 <br />XIV. COLLECTOR STREET CREDITS 6 <br />XV. CAPITAL IMPROVEMENT PROGRAM 6 <br />XVI. MAINTENANCE OF STREETS 6 <br />XVII. MUNICIPAL UTILITIES 7 <br />XVIII. CITY STANDARD STREET DESIGN 8 <br />XIX. SENIOR CITIZEN /DISABILITY SPECIAL ASSESSMENT DEFERRALS 8 <br />• <br />Pavement Management Policy i 04/18/05 <br />