Laserfiche WebLink
APPENDIX E <br />Lino Lakes Pavement Management Report <br />November 16, 2004 <br />• TOTAL MAINTENANCE COSTS AT CURRENT CONDITIONS <br />(2005 Dollars) <br />SEALCOAT <br />Cost to Sealcoat: <br />Miles of Road in Need: <br />Total Cost to Sealcoat All <br />Roads in Need: <br />OVERLAY <br />Cost for Overlay: <br />Miles of Road in Need: <br />Total Cost to Overlay All <br />Roads in Need: <br />RECONSTRUCTION <br />Cost to Reconstruct: <br />Miles of Road in Need: <br />Total Cost to Reconstruct <br />All Roads in Need: <br />• <br />$20,000.00 per Mile <br />53.02 <br />060, 500.00' <br />$180,000.00 per Mile <br />19.68 <br />$1,050,000.00 per Mile <br />11.24 <br />811'.802.000.0 <br />