My WebLink
|
Help
|
About
|
Sign Out
Home
Search
05/09/2005 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2005
>
05/09/2005 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2014 3:40:02 PM
Creation date
1/16/2014 12:58:50 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
05/09/2005
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
224
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Public Improvement Financing Plan Recommended Changes <br />Springsted <br />35 <br />We have added the language related to unit assessments for street <br />reconstruction projects to this section of the Appendix. Unit assessments for <br />street reconstruction projects make sense because it is difficult to quantify the <br />special benefit from a street reconstruction project based on the front footage of <br />a lot (ie. a lot with a front footage of 100 feet versus an adjacent lot with a front <br />footage of 115 feet). Additionally, we understand that the City has based <br />previous special assessments for street improvement projects on a unit basis for <br />the reason we have stated. Changing your policy to agree with your current <br />practice would make sense at this time. <br />Appendix A — 4. BASIC ASSESSMENT DATA REQUIRED FOR <br />EACH PARCEL <br />Adjusted Front Footage (used for all improvements except storm sewer <br />and street reconstruction) <br />Corner Lots (used for street reconstruction projects) <br />Corner lots will be assessed on a unit basis the same as interior lots. <br />When the street reconstruction on one side of the lot precedes that along <br />the other side, the lot will be assessed on a unit basis as determined by <br />this policy. Street reconstruction subsequently occurring along the other <br />lot side will be specially assessed only for the amount of units in excess <br />of one. <br />We added an exception for street reconstruction projects to Section B. <br />We added a new Section C. to provide a method for determining the <br />special assessment for corner lots to be consistent with the unit <br />assessment policy, <br />Appendix A — 6. COST ALLOCATION <br />Street Surfacing and Reconstruction <br />Benefiting properties will be assessed an amount equal to the special <br />benefit they receive from grading, base, street surfacing improvement <br />(except seal coating and overlays), and street reconstruction projects, bu <br />no less than 20% of the City's share of the costs. <br />We amended the language in this section to include special assessments <br />for street reconstruction projects and to exclude seal coating and overlay <br />which will be paid from property taxes. <br />-205- <br />City of Lino Lakes - Pavement Management Pian Financing Re <br />
The URL can be used to link to this page
Your browser does not support the video tag.