Laserfiche WebLink
Fairview Clinic, page 6 <br />• 4. All sidewalks directly abutting parking stalls within the expansion area shall be increased to a <br />minimum of six feet in width. <br />5. At least one connection between the clinics internal sidewalk system and the city trail planned for <br />the Lake Drive frontage should be included. <br />6. Prior to the issuance of building permits for the site the applicant must submit a photometric lighting <br />plan for staff review and approval. <br />7 Prior to the issuance of building permits for the site the applicant must submit a revised site plan <br />depicting 24 foot wide drive aisles in the new construction portion of the parking lot and a <br />realignment of the drive aisle at the northwest corner of the building to staffs satisfaction. The <br />number of parking spaces provided shall at no time drop below the requirements of the Zoning <br />Code. <br />8. A development agreement between the city and the developer must be executed prior to the <br />execution of the final plat by the city. <br />9. The brick used for new construction must match that of the existing building, if staff feels the <br />difference is significant enough, the Lake Drive elevation must have an architectural feature or <br />embellishment to hide the transition from new brick to old brick as much as possible. <br />10. The applicant shall dedicate a 10 foot wide trail easement parallel to Lake Drive. <br />11. The proposed addition is subject to MnDOT and Anoka County Highway Department requirements, <br />review, and approval. <br />12. Prior to the issuance of building permits for the site the applicant must submit a full revised set of <br />drawings depicting conformance with all of the above requirements. <br />13. The `Rehbein Property' must be removed from the final plat and the north line of Outlot A be <br />modified accordingly. <br />ATTACHMENTS <br />1. S.E.H. memorandum dated April 8, 2005 <br />2.. Environmental Board memorandum from March 30, 2005 meeting. <br />3. Fairview Expansion Plan Set received March 14, 2005. <br />4. Preliminary and Final Plat received March 31, 2005. <br />5. Revised Elevation and Floor Plan received May 2, 2005. <br />• <br />