Laserfiche WebLink
I. Order Improvement and Preparation of Plans and Specs <br />J. Approve Plans and Specs and Order Advertisement for Bids <br />K. Accept Bids <br />L. Assessment Hearing <br />M. Start Construction <br />N. End Construction <br />III. PROPOSED IMPROVEMENTS <br />December 2005 <br />Spring 2007 <br />Spring 2007 <br />Spring 2007 <br />Spring 2007 <br />Fall 2007 <br />As established in the existing 5 -year CIP, the following streets are programmed for <br />reconstruction in 2007: <br />A. 2007 CONSTRUCTION <br />1. Shenandoah Area <br />Rice Court Totem Trail to Cul -de -sac <br />Hokah Court Hokah Drive to Cul -de -sac <br />Hokah Drive Totem Trail to Birch Street <br />Totem Trail Arrowhead Drive to Birch Street <br />Arrowhead Drive Ware Road to 550 feet East of Totem Trail <br />Overall, these streets are typical of many streets in the City that are over 25 years in <br />age and are reaching the end of their design life. The overall condition assessment of <br />the proposed improvement areas are further described in the following Section. <br />IV. PROJECT DESCRIPTION AND HISTORY <br />The Project area is located in the southwest portion of the City, just east of Ware Road and <br />south of Birch Street. The properties in this area consist of single family homes located on <br />lots averaging roughly 1/3 acre in size. The majority of the streets were constructed in <br />1976 and sealcoated in 1987. On average, the streets are 32 feet in width (back of curb to <br />back of curb), constructed with concrete surmountable curb and gutter and bituminous <br />3 13371.000 <br />