Laserfiche WebLink
I- 35W/Lake Drive Preliminary Design Work Plan <br />Printed 10/27/2004 <br />N <br />Q <br />r <br />00 <br />4 <br />O <br />o00 <br />0 <br />tV <br />0 <br />O <br />N <br />N <br />■ <br />00 <br />cn <br />00 <br />00 <br />00 <br />00 <br />00 <br />C <br />0 <br />00 <br />00 <br />O <br />10 <br />N OD <br />'u11.1PV <br />- <br />O <br />00 <br />O <br />N <br />b <br />7 <br />N <br />0 <br />�o6an�ns <br />/1.12101M1301 <br />�0 <br />0 <br />0 <br />O <br />cc <br />N <br />00 <br />o <br />00 <br />0 <br />_ <br />0 <br />Lon <br />0 <br />N <br />0 <br />O <br />o <br />N <br />g <br />VI / lauurki <br />N <br />N <br />ON <br />,0 <br />0 <br />0 <br />�aau[Sug <br />In <br />< <br />° <br />o <br />N <br />00 <br />o <br />N <br />00 <br />0 <br />— <br />v <br />,�.d <br />O <br />O <br />V <br />00 <br />00 <br />000 <br />7 <br />0 <br />0 <br />0 <br />N <br />N <br />O <br />0 <br />7 <br />•1 '102,1 <br />/ d A <br />v <br />v <br />ao <br />- <br />7 <br />00 <br />0 <br />00 <br />d• <br />N <br />00 <br />- <br />- <br />on <br />O <br />N <br />N <br />N <br />00 <br />00 <br />00 <br />14.1 Conduct Database Reviews (DNR Natural Heritage Database, Mn/DOT T & E search, SHPO <br />database review, Contaminated Properties, etc.) <br />15.2 Prepare preliminary typical sections for each roadway section. <br />5.3 Provide preliminary design information to bridge designers. Compute critical clearances, <br />abutment and pier locations. Revise concept as required based on preliminary bridge design. <br />5.4 Develop geometric layout for the project in accordance with City, County, State Aid, and <br />MnDOT Layout Guidelines. <br />15.5 Develop layout level preliminary cross sections and construction limits to make a preliminary <br />determination of R(W impacts. <br />5.6 Develop construction staging concepts. Discuss with City, County, and MnDOT, then refine. <br />15.7 Preliminary drainage analysis including surface drainage analysis and preliminary placement of <br />storm sewer lines. <br />5.8 Compute gross base quantities. Develop a preliminary construction cost estimate. <br />15.9 Submit layout for review. Make revisions based on comments. Submit revised layout for staff <br />approval. <br />Subtotal Geometric Layout Hours: <br />Deliverables: Preliminary Geometric Layout and Profiles, Preliminary Cross Sections <br />and Construction Limits, Preliminary Construction Cost Estimate, Preliminary Drainage <br />Analysis, Staff Approved Layout. <br />6.0 I'RELI\IIN:UR' BRIDGI.: DESIGN <br />16.2 Preliminary bridge plan including geotechnical review of bridge borings. 1 <br />6.3 Preliminary bridge staging plan. <br />0 <br />0 <br />0 <br />S <br />O <br />0) <br />00 <br />v <br />0 <br />0 <br />0 0 <br />a <br />h <br />- 1 <br />Bridge Design Deliverables: Preliminary bridge plans. <br />-116- <br />Short Elliott Hendrickson Inc. <br />X: \KO Lino 110S0300 \workplan\workplan.xts <br />