My WebLink
|
Help
|
About
|
Sign Out
Home
Search
09/12/2005 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2005
>
09/12/2005 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2014 4:45:07 PM
Creation date
1/22/2014 8:38:06 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
09/12/2005
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ESTIMATE NO. 6 <br />BIRCH STREET AND HODGSON ROAD IMPROVEMENTS <br />CITY OF LINO LAKES, MINNESOTA <br />COMMISSION NO. 12993 -01 <br />PERIOD ENDING: August 31, 2005 <br />ITEM CONTRACT QUANTITY UNIT AMOUNT <br />NO. DESCRIPTION UNIT QUANTITY TO DATE PRICE TO DATE <br />51 RANDOM RIP RAP CLASS III CY 31.0 33.95 $ 93.00 $ 3,157.35 <br />52 CONCRETE CURB AND GUTTER DESIGN B418 LF 253.0 302.0 $ 17.25 $ 5,209.50 <br />53 CONCRETE CURB AND GUTTER DESIGN B618 LF 427.0 580.0 $ 15.20 $ 8,816.00 <br />54 4" CONCRETE DRIVEWAY PAVEMENT SY 144.0 141.6 $ 24.90 $ 3,525.84 <br />55 MAILBOX SUPPORT EA 3.0 2.0 $ 95.00 $ 190.00 <br />56 TRAFFIC CONTROL LS 1.0 1.0 $ 6,000.00 $ 6,000.00 <br />57 FULL T ACTT CONTROL SIGNAL SYSTEM SIG SYS 1.0 1.00 $ 105,000.00 $ 105,000.00 <br />58 EMERGENCY VEHICLE PREEMPTION SYSTEM LS 1.0 1.0 $ 5,600.00 $ 5,600.00 <br />59 REMOVE PAVEMENT MARKING - PERMANENT LF 4,000.0 1,252.0 $ 0.50 $ 626.00 <br />60 REMOVE SIGN TYPE C EA 29.0 20.0 $ 20.00 $ 400.00 <br />61 SALVAGE SIGN (INCL. POST & ASSEMBLY) EA 12.0 6.0 $ 125.00 $ 750.00 <br />62 SIGN PANELS TYPE C (F & I) (INCL. POST & ASSEMBLY) SF 247.5 251.33 $ 21.50 $ 5,403.60 <br />63 HAZARD MARKER X4 -2 EA 6.0 6.0 $ 45.00 $ 270.00 <br />64 PAVEMENT MESSAGE (LT ARROW) POLY PREFORM EA 10.0 4.0 $ 219.00 $ 876.00 <br />65 PAVEMENT MESSAGE (RT ARROW) POLY PREFORM EA 11.0 11.0 $ 219.00 $ 2,409.00 <br />66 4" SOLID LINE WHITE -PAINT LF 10,470.0 12,036.0 $ 0.12 $ 1,444.32 <br />67 24" SOLID LINE YELLOW -PAINT LF 636.0 1,218.0 $ 1.87 $ 2,277.66 <br />68 24" STOP LINE WHITE -POLY PREFORM LF 130.0 53.0 $ 15.50 $ 821.50 <br />69 4" DOUBLE SOLID LINE YELLOW -PAINT LF 6,898.0 11,856.0 $ 0.22 $ 2,608.32 <br />70 ZEBRA CROSSWALK WHITE -POLY PREFORMED SF 828.0 380.0 $ 7.75 $ 2,945.00 <br />71 SILT FENCE, TYPE PREASEMBLED LF 6,300.0 4,032.0 $ 1.75 $ 7.056.00 <br />72 INLET PROTECTION AT CB EA 2.0 5.0 $ 125.00 $ 625.00 <br />73 SODDING TYPE SALT RESISTANT SY 4,000.0 5,422.0 $ 2.00 $ 10,844.00 <br />74 SEEDING (INCL. SEED MIX 50B OR 60B, FERTILIZER, MULCH, & <br />DISC ANCHORING) ACRE 2.3 2.5 $ 1,500.00 $ 3,750.00 <br />SUBTOTAL ESTIMATE NO. 6 <br />$ 607,549.72 <br />CHANGE ORDER NO. 1 <br />1 ADDITIONAL TIME AND MATERIALS TO INSTALL SIGNAL BASES <br />DUE TO HIGHER THAN EXPECTED GROUNDWATER LS 1.0 1.0 $ 14,300.00 $ 13,000.00 <br />2 INSTALL ADA APPROVED PEDESTRIAN RAMPS DUE TO RULE <br />CHANGE AFTER BIDDING LS 1.0 1.0 $ 2,933.00 $ 2,933.00 <br />3 RELOCATE 16" WATERMAIN DUE TO CONFLICT WITH SIGNAL <br />BASE AND OTHER UTILITIES LS 1.0 1.0 $ 38,192.00 $ 38,192.00 <br />SUBTOTAL CHANGE ORDER NO. 1 <br />$ 54,125.00 <br />TOTAL ESTIMATE NO. 6 <br />$ 661,674.72 <br />
The URL can be used to link to this page
Your browser does not support the video tag.