My WebLink
|
Help
|
About
|
Sign Out
Home
Search
09/12/2005 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2005
>
09/12/2005 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2014 4:45:07 PM
Creation date
1/22/2014 8:38:06 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
09/12/2005
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AGENDA ITEM 61 <br />STAFF ORIGINATOR: James E. Studenski, City Engineer <br />COUNCIL MEETING DATE: September 12, 2005 <br />TOPIC: Resolution No. 05 -137, Accepting Bids and Awarding Construction <br />Contract, 2005 Surface Water Management Project <br />VOTE REQUIRED: 3/5 Vote Required <br />BACKGROUND: <br />Sealed bids were received and publicly opened at 10:00 a.m. on August 31, 2005. The <br />results of the bid opening are presented below. City Council action is required to award <br />a construction contract to the lowest responsible bidder. <br />Contractor <br />Jay Brothers, Inc. <br />Amount of Bid <br />$ 151,497.64 <br />Engineer's Estimate $ 118,960.00 <br />The total low bid was over the Engineer's Estimate for this project. This exceeds the <br />budgeted limit for this project. The bid proposal was separated into 8 different parts, <br />which allowed the City to award the project accordingly. The section of the project that <br />was significantly over the estimated cost was storm pipe /structure cleaning. We have <br />pulled out this portion of the project. Below is the portion of the project that shall be <br />awarded: <br />Contractor (Part A — G) Amount of Bid <br />Jay Brothers, Inc. $ 75,806.00 <br />Engineer's Estimate $ 78,270.00 <br />Jay Brothers, Inc. is aware of this change and has agreed to these terms. A copy of the <br />complete bid tabulation is attached. <br />The substantial completion date for this project is November 15, 2005, with a final <br />completion date of June 1, 2006. <br />OPTIONS: <br />1. Return to staff for further review. <br />2. Adopt Resolution Number 05 -137, Accepting Bids and Awarding a Construction <br />Contract to Jay Brothers, Inc. for the 2005 Surface Water Management Project. <br />3. Not adopt Resolution No. 05 -137. <br />RECOMMENDATION: <br />Option No. 2 - Staff recommends adoption of Resolution Number 05 -137. <br />
The URL can be used to link to this page
Your browser does not support the video tag.