My WebLink
|
Help
|
About
|
Sign Out
Home
Search
10/24/2005 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2005
>
10/24/2005 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2014 5:40:47 PM
Creation date
1/23/2014 9:32:15 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
10/24/2005
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
203
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Legacy Hotel, page 5 <br />threshold of 300 spaces which would require the implementation of connecting walkways throughout the <br />•Parkin lot. <br />• <br />• <br />All of the landscaping materials proposed as a part of the planting palette for the site satisfy the comments of <br />the Environmental Board as well as city staff. <br />Lighting <br />The photometric lighting plan submitted with the application is in conformance with the minimum standards of <br />Chapter 3.7 of the guidelines. Staff has recommended a condition that will coordinate the parking lot lighting <br />within the entire development and will be included on all of the Legacy at Woods Edge projects. <br />It is also recommended that the Domus luminaire located near the south entrance drive be moved further west to <br />better illuminate the drive. A revised lighting plan indicating conformance must be submitted prior to the <br />issuance of a building permit. <br />The building itself will include some architectural and building entry lights mounted directly to the building. <br />These fixtures will be used to highlight the building massing and will enhance the pedestrian environment. <br />Engineering <br />The city's consulting engineer on the Legacy project is Short Elliot Hendrickson (S.E.H.), and a memorandum <br />including all of their comments is attached to the report. Any outstanding issues will be addressed through the <br />site performance agreement and building permit process prior to construction. <br />Final Plat <br />The final plat for the project (Village No. 4) is attached to the same agenda as a separate item, and a condition <br />will be added to this review that the final plat must be approved prior to City Council approval for this building. <br />ENVIRONMENTAL BOARD <br />The Environmental Board reviewed this application at the August 31St regular meeting. Their comments are <br />attached and are addressed in the landscaping portion of this report. <br />PLANNING AND ZONING BOARD <br />The Planning and Zoning Board reviewed this project at the October 12, 2005 regular meeting, recommending <br />approval subject to a total of 18 conditions. Revisions to the site plan and elevations have addressed the issues <br />the Board had about the trash enclosure and the re- siting of the building closer to the right of way. These <br />revisions are not included with this report but will be included in the Friday update. The developer has raised <br />concerns in regards to three of the conditions that are being forwarded with the Planning and Zoning Board's <br />recommendation: <br />• The developer is encouraged to add an additional architectural element to the central portion of the <br />building to further strengthen the presence of the corner. <br />
The URL can be used to link to this page
Your browser does not support the video tag.