Laserfiche WebLink
LANDSCAPING: <br /> <br />A preliminary landscaping plan, together with foundation landscaping plans, has been prepared <br />and submitted for City review and consideration. The proposed landscaping has been designed in <br />accordance with the City of Lino Lakes Code of Ordinances pertaining to landscaping, tree <br />preservation, and tree mitigation requirements. <br />Based on the applicable ordinance standards and the tree summary calculations identified on Sheet <br />L1 of L2, the total number of required trees for the development is one hundred forty-three (143). <br />The preliminary landscaping plan demonstrates compliance with all applicable City of Lino Lakes <br />requirements, including landscaping, boulevard tree placement, buffering and screening, and tree <br />preservation and mitigation standards. All required trees are provided within the proposed open <br />space, boulevard, and mitigation areas. The plan meets or exceeds the minimum requirements <br />established by the City of Lino Lakes. <br />WATER REUSE FOR IRRIGATION: <br />Water reuse is proposed for the (55) attached townhomes to reduce potable water demand, support <br />sustainable practices, and protect natural resources. Two stormwater basins, “Borrow Area 11,” <br />will provide water for reuse to meet City of Lino Lakes requirements. Carlson Engineering’s <br />January 6, 2026, Stormwater Re-Use Memo details irrigation volume, availability, and <br />sustainability for City consideration. The final irrigation system, including layout and spray <br />patterns, will be prepared by the selected designer and submitted with the Final Plat. <br />MONUMENT & MAILBOXES: <br />The residential development will include an entrance monument that will be owned and maintained <br />by the Townhome Homeowners Association. The proposed monument will be located on the south <br />side of Drive A, east of Lot 86 as depicted on the Preliminary Landscaping Plan. The monument <br />will be situated entirely within the townhome base lot, eliminating the need for an easement or the <br />creation of an outlot. The monument will be designed in compliance with the City’s Sign <br />Ordinance (Chapter 1010), and a sign permit will be obtained from the City of Lino Lakes prior to <br />construction. <br /> <br />Cluster mailbox units (CBUs) will be provided to serve all eighty-six (86) lots. The project team <br />will coordinate directly with the mailbox vendor to prepare and submit a Growth Packet to the <br />City of Lino Lakes Post Office for review and approval for mailbox locations. The CBUs will be <br />owned and maintained by the Homeowners Association. <br /> <br />HOUSING INFORMATION: <br /> <br />The Harvest Grange development is planned to include a total of eighty-six (86) homes, <br />thoughtfully designed to provide diverse housing options for the community. The project <br />incorporates two zoning designations: R2 –Two-Family Residential, for the 60-foot single-family <br />lots, and R3 – Medium Density, for the multi-unit townhomes. This combination allows for two <br /> <br />