My WebLink
|
Help
|
About
|
Sign Out
Home
Search
02/11/2026 PZ Combined Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2026
>
02/11/2026 PZ Combined Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2026 10:12:47 AM
Creation date
2/12/2026 10:12:38 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Agenda
Meeting Date
02/11/2026
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />ANALYSIS <br />Existing Conditions <br />The existing public works facility is located on a 28-acre parcel, divided diagonally by a large <br />wetland and floodplain complex. The property is currently served by onsite septic system and <br />well. City Hall park is also located on the property. One softball field and the ice hockey rink <br />will be removed as part of the project. Three new pickleball courts will be added as part of the <br />improvements to the site. <br />The City published notice of the public hearing and proposed change in the official newspaper. <br />Land Use Plan <br />The site is currently guided public/semi-public in the 2040 Comprehensive Plan. No change is <br />proposed. <br />Utility Staging Plan <br />The property currently lies within the Stage 3 Planned Service Area (Post 2040). The <br /> amendment proposes to change the City’s property to Stage 1A Planned Service Area (2018 – <br />2025). <br />Sanitary Sewer <br />The public works property lies with sanitary sewer subdistrict 2C which is intended to be served <br />by a future sanitary sewer lift station that pumps effluent to the sanitary sewer trunk line along <br />Lake Drive (subdistrict 2B), west of the site. The City is proposing to construct a small pump <br />station that will only service the proposed building. No additional areas of subdistrict 2C will <br />be served by this line. Projected flows from the Public Works building will likely be rerouted to <br />a future larger Lift Station serving subdistrict 2C when it develops. The balance of subdistrict <br />2C is not intended to develop until after 2040. <br />The limited flows from the public works station are within the available capacity and projected <br />flows of Sewer District 2. <br />Water <br />st <br /> A 12” water main will be extended from either 81 Avenue or Janes Avenue to service the site. <br />The water main will serve as a future trunk line for service within district 2C and as a possible <br /> distribution line for a future well field near Public Works, identified in the City’s comprehensive <br />2 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.