My WebLink
|
Help
|
About
|
Sign Out
Home
Search
02/11/2026 PZ Combined Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2026
>
02/11/2026 PZ Combined Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2026 10:12:47 AM
Creation date
2/12/2026 10:12:38 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Agenda
Meeting Date
02/11/2026
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />plan. The planned water use of approximately 2.4 million gallons a year is within the available <br />capacity of the existing system and our permitted annual appropriation. <br />In summary: <br />1.The 28 acre public works property will be changed from Stage 3 Planned Service Area to <br />Stage 1A Planned Service Area on the Utility Staging Map. <br />2.No other properties outside of the existing Stage 1A area will be served by the proposed <br /> extension without an amendment to the City’s Comprehensive Plan. <br />3.No utility service stubs will be provided to abutting properties outside of the Stage 1A <br />Urban Service Area. <br />Consistency with the Comprehensive Plan <br />The proposed amendments are supported by and consistent with the Sanitary Sewer <br />(Chapter 8) goals and policies as noted below: <br />Goal 1c. Provide for the capacity and extension of sanitary sewer to developed areas of <br />the city currently served by on-site systems. <br />The proposed amendments are supported by and consistent with the Community Facilities <br />(Chapter 11) goals and policies as noted below: <br />Goal 3. Maintain quality public facilities and the full complement of city services to the <br />residents of Lino Lakes. <br />Findings of Fact <br />The following are Findings of Fact for the Comprehensive Plan Amendment: <br />1.The proposed 2040 Comprehensive Plan amendments are needed to provide municipal <br /> services to the City’s Public Works Building. <br />2.The proposed staging plan changes are consistent with the policy text for the 2040 <br />Comprehensive Plan. <br />3.The proposed amendment is consistent with Sanitary Sewer Plan planned infrastructure <br />improvements and simply allows those improvements to occur earlier. <br />4.The proposed amendment is consistent with Water Supply Plan planned infrastructure <br />improvements and simply allows those improvements to occur earlier. <br />5.The municipal utility service will be limited to the Public Works Building and no other <br />properties outside of the Stage 1A Planned Service Area will be allowed to connect <br />without an amendment to the Comprehensive Plan. <br />6.Municipal utility services are not being provided to any properties outside of the Stage <br />1A Planned Service Areas and no special assessments are proposed for properties <br />abutting the proposed extension. <br />3 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.