Laserfiche WebLink
ESTIMATE NO. 5 (FINAL) <br />2004 SURFACE WATER MANAGEMENT PROJECTS <br />CITY OF LINO LAKES, MINNESOTA <br />•TKDA PROJECT NO. 13133.001 <br />ITEM CONTRACT QUANTITY UNIT AMOUNT <br />NO. DESCRIPTION UNIT QUANTITY TO DATE PRICE TO DATE <br />A ANDALL STREET (PROJECT LOCATION 1) <br />1 MOBILIZATION LS 1.0 1.0 $ 1,000.00 $ 1,000.00 <br />2 CLEAR AND GRUB TREES /BRUSH LS 1.0 1.0 $ 700.00 $ 700.00 <br />3 DITCH EXCAVATION CY 350.0 82.0 $ 16.00 $ 1,312.00 <br />4 CLEAN STORM SEWER PIPE LF 100.0 221.0 $ 8.00 $ 1,768.00 <br />5 CLEAN CATCH BASIN EA 3.0 3.0 $ 105.00 $ 315.00 <br />6 TRAFFIC CONTROL LS 1.0 1.0 $ 300.00 $ 300.00 <br />7 SEEDING AND RESTORATION LS 1.0 1.0 $ 600.00 $ 600.00 <br />8 EROSION CONTROL LS 1.0 1.0 $ 500.00 $ 500.00 <br />SUBTOTAL A $ 6,495.00 <br />PERIOD ENDING: November 29, 2005 <br />B 4TH AVENUE DITCH (PROJECT LOCATION 2) <br />1 MOBILIZATION LS 1.0 1.0 $ 1,000.00 $ 1,000.00 <br />2 CLEAR AND GRUB TREES /BRUSH LS 1.0 1.0 $ 500.00 $ 500.00 <br />3 DITCH EXCAVATION CY 200.0 50.0 $ 17.80 $ 890.00 <br />4 CLEAN EXISTING DRIVEWAY CULVERT LF 30.0 30.0 $ 15.00 $ 450.00 <br />5 TRAFFIC CONTROL LS 1.0 1.0 $ 300.00 $ 300.00 <br />6 SEEDING AND RESTORATION LS 1.0 1.0 $ 800.00 $ 800.00 <br />7 EROSION CONTROL LS 1.0 1.0 $ 750.00 $ 750.00 <br />SUBTOTAL B $ 4,690.00 <br />C BALD EAGLE/WOODCHUCK (PROJECT LOCATION 3) <br />1 MOBILIZATION LS 1.0 1.0 $ 1,000.00 $ 1,000.00 <br />2 CLEAR AND GRUB TREES /BRUSH LS 1.0 1.0 $ 150.00 $ 150.00 <br />III3 12" RCP STORM SEWER (CLASS 5) LF 100.0 81.0 $ 32.00 $ 2,592.00 <br />4 12" RCP F.E.S. WITH TRASH GUARD EA 2.0 2.0 $ 630.00 $ 1,260.00 <br />5 FURNISH AND INSTALL CATCH BASIN (TYPE 402) EA 2.0 2.0 $ 720.00 $ 1,440.00 <br />6 RIP RAP (CLASS II) CY 3.0 3.0 $ 120.00 $ 360.00 <br />7 REMOVE BITUMINOUS PAVEMENT SY 80.0 35.0 $ 5.00 $ 175.00 <br />8 COMMON EXCAVATION (STREET AND PIPE CULVERT) CY 50.0 50.0 $ 20.00 $ 1,000.00 <br />9 AGGREGATE BASE, CLASS 5 (100% CRUSHED) TN 30.0 10.0 $ 30.00 $ 300.00 <br />10 3" BITUMINOUS PAVEMENT (LVWE45030B) PATCHING TN 20.0 9.17 $ 130.00 $ 1,192.10 <br />11 TRAFFIC CONTROL LS 1.0 1.0 $ 500.00 $ 500.00 <br />12 SODDING AND RESTORATION SY 50.0 50.0 $ 8.00 $ 400.00 <br />13 EROSION CONTROL LS 1.0 1.0 $ 500.00 $ 500.00 <br />SUBTOTAL C $ 10,869.10 <br />D SOUTHWEST AREA (PROJECT LOCATION 4) <br />1 MOBILIZATION LS 1.0 1.0 $ 3,475.00 $ 3,475.00 <br />2 CLEAN STORM SEWER PIPE (12' - 27" DIA.) LF 5,500.0 10,275.0 $ 2.00 $ 20,550.00 <br />3 CLEAN /OPEN STORM SEWER OUTFALL EA 46.0 19.0 $ 500.00 $ 9,500.00 <br />4 CLEAN CATCH BASIN /MANHOLE STRUCTURE EA 111.0 88.0 $ 120.00 $ 10,560.00 <br />5 REPAIR CATCH BASIN /MANHOLE STRUCTURE EA 5.0 - $ 400.00 $ <br />6 TRAFFIC CONTROL LS 1.0 1.0 $ 1,200.00 $ 1,200.00 <br />7 SELECT TOPSOIL BORROW (LV) CY 100.0 - $ 10.00 $ - <br />8 SEEDING AND RESTORATION AC 0.1 - $ 8,000.00 $ <br />9 SODDING AND RESTORATION SY 100.0 - $ 6.00 $ <br />10 EROSION CONTROL LS 1.0 - $ 500.00 $ - <br />SUBTOTAL D $ 45,285.00 <br />• <br />