Laserfiche WebLink
ESTIMATE NO. 5 (FINAL) <br />2004 SURFACE WATER MANAGEMENT PROJECTS <br />CITY OF LINO LAKES, MINNESOTA <br />• TKDA PROJECT NO. 13133.001 <br />ITEM CONTRACT QUANTITY UNIT AMOUNT <br />NO. DESCRIPTION UNIT QUANTITY TO DATE PRICE TO DATE <br />E 4TH AVENUE CULVERT REPLACEMENT (PROJECT LOCATION 5) <br />1 MOBILIZATION LS 1.0 1.0 $ 1,000.00 $ 1,000.00 <br />2 REMOVE BITUMINOUS PAVEMENT SY 50.0 34.0 $ 5.00 $ 170.00 <br />3 REMOVE EXISTING CULVERT LF 30.0 30.0 $ 8.00 $ 240.00 <br />4 DITCH EXCAVATION CY 100.0 20.0 $ 15.00 $ 300.00 <br />5 18" RCP STORM SEWER (CLASS 5) CULVERT LF 30.0 30.0 $ 28.00 $ 840.00 <br />6 18" RCP FES WITH TRASH GUARD EA 2.0 2.0 $ 800.00 $ 1,600.00 <br />7 AGGREGATE BASE, CLASS 5 (100% CRUSHED) TN 20.0 10.0 $ 30.00 $ 300.00 <br />8 3" BITUMINOUS PAVEMENT (LVWE45030B) PATCHING TN 10.0 9.17 $ 135.00 $ 1,237.95 <br />9 TRAFFIC CONTROL LS 1.0 1.0 $ 300.00 $ 300.00 <br />10 SEEDING AND RESTORATION LS 1.0 1.0 $ 500.00 $ 500.00 <br />11 EROSION CONTROL LS 1.0 1.0 $ 500.00 $ 500.00 <br />SUBTOTAL E <br />$ 6,987.95 <br />PERIOD ENDING: November 29, 2005 <br />F PELTIER LAKE DRIVE CULVERT REPLACEMENT (PROJECT LOCATION 6) <br />1 MOBILIZATION LS 1.0 1.0 $ 1,000.00 $ 1,000.00 <br />2 REMOVE BITUMINOUS PAVEMENT SY 50.0 20.0 $ 5.00 $ 100.00 <br />3 REMOVE EXISTING CULVERT LF 30.0 30.0 $ 8.00 $ 240.00 <br />4 18" RCP STORM SEWER (CLASS 5) LF 30.0 30.0 $ 30.00 $ 900.00 <br />5 18" RCP F.E.S. WITH TRASH GUARD EA 2.0 2.0 $ 800.00 $ 1,600.00 <br />6 AGGREGATE BASE CLASS 5 (100% CRUSHED) TON 20.0 10.0 $ 30.00 $ 300.00 <br />7 3" BITUMINOUS PAVEMENT (LVWE45030B) TON 10.0 9.17 $ 135.00 $ 1,237.95 <br />8 TRAFFIC CONTROL LS 1.0 1.0 $ 500.00 $ 500.00 <br />9 SEEDING AND RESTORATION LS 1.0 1.0 $ 500.00 $ 500.00 <br />10 EROSION CONTROL LS 1.0 1.0 $ 500.00 $ 500.00 <br />•SUBTOTAL F $ 6,877.95 <br />G WENZEL FARMS DITCH CLEANING PROJECT LOCATION TION 7) <br />1 MOBILIZATION LS 1.0 1.0 $ 1,000.00 $ 1,000.00 <br />2 CLEAR AND GRUB TREES /BRUSH LS 1.0 1.0 $ 900.00 $ 900.00 <br />3 DITCH EXCAVATION CY 100.0 40.0 $ 19.00 $ 760.00 <br />4 TRAFFIC CONTROL LS 1.0 1.0 $ 500.00 $ 500.00 <br />5 SEEDING AND RESTORATION SY 100.0 110.0 $ 5.00 $ 550.00 <br />6 EROSION CONTROL LS 1.0 - $ 1,000.00 $ <br />SUBTOTAL G $ 3,710.00 <br />• <br />H CENTURY FARMS (RIP RAP) (PROJECT LOCATION 8) <br />1 MOBILIZATION LS 1.0 1.0 $ 1,000.00 $ 1,000.00 <br />2 CLEAR AND GRUB TREES /BRUSH LS 1.0 1.0 $ 700.00 $ 700.00 <br />3 INSTALL RIP RAP (CLASS II) CY 5.0 15.0 $ 145.00 $ 2,175.00 <br />4 SODDING AND RESTORATION SY 100.0 - $ 6.00 $ <br />SUBTOTAL H $ 3,875.00 <br />SUBTOTAL ESTIMATE NO. 5 (FINAL) $ 88,790.00 <br />CHANGE ORDER NO. 1 <br />1 MOBILIZATION LS 1.0 1.0 $ 1,500.00 $ 1,500.00 <br />2 COMMON EXCAVATION CY 70.0 160.0 $ 10.00 $ 1,600.00 <br />3 6 -INCH DIAMETER DRAINTILES (INCLUDING FITTINGS, <br />GEOTEXTILE WRAP, AGGREGATE AND CONNECTIONS) LF 190.0 458.0 $ 39.98 $ 18,310.84 <br />4 TRAFFIC CONTROL LS 1.0 1.0 $ 300.00 $ 300.00 <br />5 SELECT TOPSOIL BORROW (4 -INCH DEPTH) CY 100.0 150.0 $ 12.00 $ 1,800.00 <br />6 SODDING - RESTORATION SY 900.0 1,050.0 $ 5.00 $ 5,250.00 <br />7 EROSION CONTROL LS 1.0 1.0 $ 300.00 $ 300.00 <br />SUBTOTAL CHANGE ORDER NO. 1 $ 29,060.84 <br />TOTAL ESTIMATE NO. 5 (FINAL) $ 117,850.84 <br />-22- <br />