My WebLink
|
Help
|
About
|
Sign Out
Home
Search
12/19/2005 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2005
>
12/19/2005 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2014 10:05:32 AM
Creation date
1/24/2014 11:45:31 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
12/19/2005
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COMPENSATING CHANGE ORDER NO. 2 <br />2004 SURFACE WATER MANAGEMENT PROJECTS <br />CITY OF LINO LAKES, MINNESOTA <br />TKDA PROJECT NO. 13133.001 <br />PERIOD ENDING: November 29, 2005 <br />• CONTRACT QUANTITY +1- UNIT AMOUNT NET CONTRACT <br />DESCRIPTION UNIT QUANTITY TO DATE DIFFERENCE PRICE TO DATE CHANGE AMOUNT <br />G WENZEL FARMS DITCH CLEANING (PROJECT LOCATION 7) <br />1 MOBILIZATION LS 1.0 1.0 - $ 1,000.00 $ 1,000.00 $ $ 1,000.00 <br />2 CLEAR AND GRUB TREES /BRUSH LS 1.0 1.0 - $ 900.00 $ 900.00 $ - $ 900.00 <br />3 DITCH EXCAVATION CY 100.0 40.0 (60.0) $ 19.00 $ 760.00 $ (1,140.00) $ 1,900.00 <br />4 TRAFFIC CONTROL LS 1.0 1.0 - $ 500.00 $ 500.00 $ - $ 500.00 <br />5 SEEDING AND RESTORATION SY 100.0 110.0 10.0 $ 5.00 $ 550.00 $ 50.00 $ 500.00 <br />6 EROSION CONTROL LS 1.0 (1.0) $ 1,000.00 $ $ (1,000.00) $ 1,000.00 <br />SUBTOTAL G <br />$ 3,710.00 $ (2,090.00) $ 5,800.00 <br />H CENTURY FARMS (RIP RAP) (PROJECT LOCATION 8) <br />1 MOBILIZATION LS 1.0 1.0 - $ 1,000.00 $ 1,000.00 $ - $ 1,000.00 <br />2 CLEAR AND GRUB TREES /BRUSH LS 1.0 1.0 - $ 700.00 $ 700.00 $ - $ 700.00 <br />3 INSTALL RIP RAP (CLASS II) CY 5.0 15.0 10.0 $ 145.00 $ 2,175.00 $ 1,450.00 $ 725.00 <br />4 SODDING AND RESTORATION SY 100.0 (100.0) $ 6.00 $ - $ (600.00) $ 600.00 <br />SUBTOTAL H $ 3,875.00 $ 850.00 $ 3,025.00 <br />SUBTOTAL COMPENSATING CHANGE ORDER NO. 2 $ 88,790.00 $ (23,935.00) $ 112,725.00 <br />CHANGE ORDER NO. 1 <br />1 MOBILIZATION LS 1.0 1.0 - $ 1,500.00 $ 1,500.00 $ - $ 1,500.00 <br />2 COMMON EXCAVATION CY 70.0 160.0 90.0 $ 10.00 $ 1,600.00 $ 900.00 $ 700.00 <br />3 6 -INCH DIAMETER DRAINTILES (INCLUDING FITTINGS, <br />GEOTEXTILE WRAP, AGGREGATE AND CONNECTIONS) LF 190.0 458.0 $ 39.98 $ 18,310.84 $ 10,714.64 $ 7,596.20 <br />4 TRAFFIC CONTROL LS 1.0 1.0 $ 300.00 $ 300.00 $ $ 300.00 <br />5 SELECT TOPSOIL BORROW (4 -INCH DEPTH) CY 100.0 150.0 $ 12.00 $ 1,800.00 $ 600.00 $ 1,200.00 <br />6 SODDING - RESTORATION SY 900.0 1,050.0 150.0 $ 5.00 $ 5,250.00 $ 750.00 $ 4,500.00 <br />7 EROSION CONTROL LS 1.0 1.0 - $ 300.00 $ 300.00 $ - $ 300.00 <br />SUBTOTAL CHANGE ORDER NO. 1 $ 29,060.84 $ 12,964.64 $ 16,096.20 <br />• <br />TOTAL COMPENSATING CHANGE ORDER NO. 2 $ 117,850.84 $ (10,970.36) $ 128,821.20 <br />-25- <br />
The URL can be used to link to this page
Your browser does not support the video tag.