Laserfiche WebLink
City of Lino Lakes — Surface Water Management Plan <br />1/10/11 <br />Deliverables: <br />• Data to be included on two (2) large scale maps as described under Task 4.1. <br />• Table summarizing modeling information for future conditions <br />Assumptions: <br />• Costs for modeling estimated in this work plan reflect the cost of using the RCWD- <br />revised models and may require modeling of one or two events. <br />• We assume that the storm sewer inventory data provided by the City of Lino Lakes <br />will be adequate for the purposes of this Local Surface Water Management Plan and <br />that no additional field work or surveying will be required by EOR. <br />• No new developments will be added to the existing XP-SWMM models. <br />• Modeling necessary to demonstrate nondegradation would require model <br />modifications to existing land use and drainage system. This work plan does not <br />include any remodeling work but will identify this additional effort as a future <br />action/implementation item. <br />Cost Assumptions: <br />• 40 EOR staff hours <br />• $3,885 <br />Task 2.2 Water Quality Models <br />Description: <br />Annual pollutant loads from each subwatershed, pond and drainage system have been <br />modeled and reported in both the RMP and TMDLs. The LSWMP will include a <br />summary of information provided in previous modeling efforts to be used to facilitate the <br />prioritization of treatment locations for the stormwater BMPs in the Implementation Plan. <br />The existing PLOAD and P8 model results will be used without modification. <br />Deliverables: <br />• Data to be included on subwatershed loading figure (included under Task 4.1) <br />• Pollutant loading table <br />• Summary and prioritization of treatment locations <br />Assumptions: <br />• Modeling necessary to demonstrate nondegradation would require model <br />modifications to existing land use and drainage system. This workplan does not <br />include any remodeling work but will identify this additional effort as a future <br />action/implementation item. <br />Cost Assumptions: <br />• 40 EOR staff hours <br />• $3,834 <br />Emmons & Olivier Resources, Inc. <br />water 1 ecology I community <br />3 <br />-94- <br />• <br />• <br />• <br />