My WebLink
|
Help
|
About
|
Sign Out
Home
Search
03/28/2011 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2011
>
03/28/2011 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2014 11:14:06 AM
Creation date
1/28/2014 9:05:14 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
03/28/2011
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
179
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
removing such equipment and facilities and repairing any damage to co- location <br />sites and restoring co- location sites and to their prior condition? <br />A and B. See liability and termination sections (IX and XIV) of Connectivity <br />Services Agreement. The County will work with Zayo to remove the equipment if <br />needed. Any damage repair (assuming there is) will need to be repaired by the <br />party who caused it. The County will not restore to prior condition as the bringing <br />fiber into a designated area and installing equipment will not cause major <br />changes to the building. <br />24. If a participating entity is ultimately deemed in default for failing to pay <br />amounts owed for a single co- location site, can Anoka County and ZAYO <br />suspend Connectivity Services provided to all the entity's other community <br />anchor institutions and co- location sites? <br />If a entity is in default for one of multiple sites, the entity is default. We would <br />pursue default remedies. If an entity desires to terminate only one of several <br />sites, it may do so with 180 days notice and avoid default. <br />25. With respect to connectivity, please define what and to whom (e.g., 100 <br />Mbps to the? To another location? Per location? 100 Mbps to a node? 100 <br />Mbps to Anoka County's control center ?) <br />There will be a physical connection (100 mbps or 1 Gbps) to equipment at a <br />specific physical location. This physical interface may logically connect to one or <br />more remote locations on the Anoka County network — the aggregate capacity of <br />the physical interface may not exceed the subscribed (100 mbps or 1 Gbps) <br />capacity. <br />26. How will a 10 Gbps backbone support the connections anticipated by Anoka <br />County? <br />The 10 Gbps backbone is a shared resource and will be used to connect the <br />community anchor institutions on the network. <br />27. A. Is the ZAYO System scalable? B. If so, please describe how, with any <br />current plans, designs or anticipated upgrades. <br />A. Yes. <br />B. Anoka can negotiate with Zayo to purchase additional capacity /equipment for <br />expansion if necessary. Additional 10 gbps capacity on the backbone can be <br />
The URL can be used to link to this page
Your browser does not support the video tag.