removing such equipment and facilities and repairing any damage to co- location <br />sites and restoring co- location sites and to their prior condition? <br />A and B. See liability and termination sections (IX and XIV) of Connectivity <br />Services Agreement. The County will work with Zayo to remove the equipment if <br />needed. Any damage repair (assuming there is) will need to be repaired by the <br />party who caused it. The County will not restore to prior condition as the bringing <br />fiber into a designated area and installing equipment will not cause major <br />changes to the building. <br />24. If a participating entity is ultimately deemed in default for failing to pay <br />amounts owed for a single co- location site, can Anoka County and ZAYO <br />suspend Connectivity Services provided to all the entity's other community <br />anchor institutions and co- location sites? <br />If a entity is in default for one of multiple sites, the entity is default. We would <br />pursue default remedies. If an entity desires to terminate only one of several <br />sites, it may do so with 180 days notice and avoid default. <br />25. With respect to connectivity, please define what and to whom (e.g., 100 <br />Mbps to the? To another location? Per location? 100 Mbps to a node? 100 <br />Mbps to Anoka County's control center ?) <br />There will be a physical connection (100 mbps or 1 Gbps) to equipment at a <br />specific physical location. This physical interface may logically connect to one or <br />more remote locations on the Anoka County network — the aggregate capacity of <br />the physical interface may not exceed the subscribed (100 mbps or 1 Gbps) <br />capacity. <br />26. How will a 10 Gbps backbone support the connections anticipated by Anoka <br />County? <br />The 10 Gbps backbone is a shared resource and will be used to connect the <br />community anchor institutions on the network. <br />27. A. Is the ZAYO System scalable? B. If so, please describe how, with any <br />current plans, designs or anticipated upgrades. <br />A. Yes. <br />B. Anoka can negotiate with Zayo to purchase additional capacity /equipment for <br />expansion if necessary. Additional 10 gbps capacity on the backbone can be <br />