Laserfiche WebLink
<br />Pre- and Post- Development Discharge Rates (cfs) <br />2- <br />Condition10-Year100-Year10-Day Snowmelt <br />Year <br />Existing - Creek15.0023.2456.26N/A <br />Proposed - Creek10.3513.6640.14N/A <br />Existing - West5.5910.1527.00N/A <br />Proposed - West3.976.5120.40N/A <br /> Existing – <br />8.7218.6941.10N/A <br />Southeast (wetland) <br /> Proposed – <br />8.7218.6941.10N/A <br />Southeast (wetland) <br />Additional comments/revisions are noted in the attached City Engineer memo. <br />Public Utilities <br /> The site will be municipally served by an 8” sanitary sewer main and 8” watermain along 70th <br />Street. <br />Public Land Dedication <br />The City will collect cash fee in lieu of land dedication for commercial development at the time <br />of final plat. <br />nd <br />Otter Crossing South 2 Addition <br />2.00 acres x $2,725 per acre =$5,450 <br />Tree Preservation, Mitigation Standards and Landscaping <br />Per the February 26, 2026 Environmental Board staff report: <br />Tree Preservation <br />No significant trees are being removed as part of this project. <br />Landscaping <br />Landscaping will be required for each lot as it develops and will be required to meet all city <br />requirements. Currently trees are being planted along the private street for screening. <br />5 <br /> <br />