Laserfiche WebLink
<br />1. If the existing level of service (LOS) outside of the proposed subdivision is A or B, traffic <br />generated by a proposed subdivision will not degrade the level of service more than one <br />grade; <br />2. If the existing LOS outside of the proposed subdivision is C, traffic generated by a <br />proposed subdivision will not degrade the level of service below C; <br />3. If the existing LOS outside of the proposed subdivision is D, traffic generated by a <br />proposed subdivision will not degrade the level of service below D; <br />4. The existing LOS must be D or better for all streets and intersections providing access <br />to the subdivision. If the existing level of service is E or F, the subdivision developer must <br />provide, as part of the proposed project, improvements needed to ensure a level of <br />service D or better; <br />5. Existing roads and intersections providing access to the subdivision must have the <br />structural capacity to accommodate projected traffic from the proposed subdivision or <br />the developer will pay to correct any structural deficiencies; <br />6. The traffic generated from a proposed subdivision shall not require city street <br />improvements that are inconsistent with the Lino Lakes capital improvement plan. <br />However, the city may, at its discretion, consider developer-financed improvements to <br />correct any street deficiencies; <br />7. The LOS requirements in divisions (2)(c)1. to 4. above do not apply to the I-35W/Lake <br />Drive or I-35E/Main St. interchanges. At city discretion, interchange impacts must be <br />evaluated in conjunction with Anoka County and the Minnesota Department of <br />Transportation, and a plan must be prepared to determine improvements needed to <br />resolve deficiencies. This plan must determine traffic generated by the subdivision <br />project, how this traffic contributes to the total traffic, and the time frame of the <br />improvements. The plan also must examine financing options, including project <br />contribution and cost sharing among other jurisdictions and other properties that <br />contribute to traffic at the interchange; and <br /> 8. The city does not relinquish any rights of local determination. <br />nd <br />Otter Crossing South 2 Addition preliminary plat meets the requirements for level of service <br />(LOS). Intersections currently operate at an overall Level of Service (LOS) A. Build condition <br />overall LOS will continue to operate at a level A. <br />The proposed Level of Service does not degrade by more than one (1) LOS; therefore, the <br />development is not considered premature. Existing roads and intersections providing access to <br />the subdivision have the structural capacity to accommodate projected traffic from the <br /> proposed subdivision. No street improvements are proposed that are inconsistent with the City’s <br />capital improvement plan. The city does not relinquish any rights of local determination. <br />(d) Water supply. A proposed subdivision shall be deemed to have an adequate water <br />supply when: <br />1. The city water system has adequate wells, storage or pipe capacity to serve the <br />subdivision; <br />12 <br /> <br />