My WebLink
|
Help
|
About
|
Sign Out
Home
Search
08/12/2002 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2002
>
08/12/2002 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2014 2:01:16 PM
Creation date
2/6/2014 10:16:12 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
08/12/2002
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AGENDA ITEM 7D <br />STAFF ORIGINATOR: James E. Studenski, City Engineer <br />COUNCIL MEETING DATE: August 12, 2002 <br />TOPIC: Resolution No. 02 -90, Receive Bids and Award Construction Contract, <br />West Shadow Ponds Improvements <br />VOTE REQUIRED: 3/5 Vote Required <br />BACKGROUND: <br />Sealed bids were received and publicly opened at 1:00 p.m. on August 1, 2002. The <br />results of the bid opening are presented below. City Council action is required to award <br />a construction contract to the lowest responsible bidder. <br />Contractor Amount of Bid <br />Richard Knutson, Inc. $327,809.05 <br />S.R. Weidema, Inc. $401,938.77 <br />Penn Contracting, Inc. $409,752.90 <br />W. B. Miller, Inc. $422,902.15 <br />Park Construction Co., Inc. $427,961.30 <br />Engineer's Estimate $302,663.50 <br />The low bid is approximately 8% over the Engineer's Estimate for this project. A copy of <br />the complete bid tabulation is attached. The City required a watermain pipe size <br />increase and an extension as part of the trunk system at a cost of $8,129.00. The trunk <br />watermain area and unit charges for this development are approximately $49,000.00 for <br />a total increase to the trunk fund of approximately $41,000.00. The City required the <br />sanitary sewer to be installed at a greater depth and an extension as part of the trunk <br />system at a cost of $11,846.00. The trunk sanitary sewer area and unit charges for this <br />development are approximately $35,000.00 for a total increase to the trunk fund of <br />approximately $23,000.00. The remainder of the costs of this project will be recovered <br />through special assessments to the benefiting properties per the development <br />agreement. <br />The substantial completion date for this project is October 4, 2002, with a final <br />completion date of May 15, 2002. <br />OPTIONS: <br />1. Return to staff for further review. <br />2. Adopt Resolution Number 02 -90, accepting bids and awarding a construction <br />contract to Richard Knutson, Inc. for the West Shadow Ponds project. <br />3. Not adopt Resolution No. 02 -90. <br />RECOMMENDATION: <br />Option No. 2 - Staff recommends adoption of Resolution Number 02 -90. <br />
The URL can be used to link to this page
Your browser does not support the video tag.