My WebLink
|
Help
|
About
|
Sign Out
Home
Search
08/26/2002 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2002
>
08/26/2002 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2014 1:50:56 PM
Creation date
2/6/2014 12:12:17 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
08/26/2002
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />Total cost for areas receiving this treatment is approximately $4500. <br />Revegetation activities will be completed concurrent with project phases. Areas B2, A9, <br />and E3 will be completed with Phase 1, Area E5 will be completed with Phase II, and <br />Areas Al l . and A6 will be completed with Phase III. Management activities associated <br />with the establishment of the communities will be completed within approximately 3 <br />years of the seeding date. <br />The long -term viability of these areas is expected to be good, with low to moderate on= <br />going maintenance requirements. <br />C. Existing. Wooded Areas — Invasive Shrub Removal and Management. <br />Wooded areas throughout the property have been subject to historic disturbance.by <br />livestock. As a result, invasive shrubs have become a dominant component of the <br />understory, competing with more desirable native species and shading herbaceous ground <br />cover. <br />Management of these shrubs generally involves shrub removal and direct herbicide <br />application.to prevent regrowth. A second treatment may be required after 1 -2 years, <br />with a light burn, as feasible. <br />• This.treatment is appropriate for areas A10, Bl, B4, Cl, C3; C4, and El. <br />Appro/dinately. 7.5-acres are proposed for this treatment. _ <br />Costs for.this treatment are expected to range from $2,500. _ $5,000 per acre. Total cost <br />for areas receiving this treatment is $ 19,000 — $37,500. <br />•Shrub.ren3oval will begin during April and May, 2000, and be completed by October, <br />'2001. • <br />The long -term-viability of this approach is uncertain. Without ongoing control activities. <br />these, areas are likely to be re- invaded due to the abundance in seed sources on adjacent • <br />properties. <br />D. Wetlatnd Vegetation Restoration <br />Wetland E3 (Wetland E) currently is dominated by a reed canary grass monoculture, <br />which has Iow aesthetic and wildlife habitat values. <br />Proposed: activities would include removal of the existing plant community by. chemical <br />treatment and scraping, if appropriate, the upper 12 inches- of soil. The area would then <br />be reseeded with a suitable wet meadow mixture. • <br />• Estimated cost to complete the restoration of this 0.5 -acre wetland is $3000. <br />
The URL can be used to link to this page
Your browser does not support the video tag.