My WebLink
|
Help
|
About
|
Sign Out
Home
Search
08/26/2002 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2002
>
08/26/2002 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2014 1:50:56 PM
Creation date
2/6/2014 12:12:17 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
08/26/2002
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />Scraping: and vegetation removal will be completed in spring, 2000. Revegetation will be <br />completed in June, 2000. Management activities associated with the plant community <br />establishment will be completed by October, 2003. <br />Long -term viability of this restoration is good with low maintenance requirements. <br />E. Wetland Reconstruction/Restoration <br />Wetlands C, D, and F have been extensively disturbed by past excavation activities. <br />Current conditions include marginal wetland hydrology and low diversity wetland plant <br />• communities. <br />Proposed activities would attempt to restore and supplement wetland hydrology, remove <br />red canary grass, consolidate wetlands, and remove trash, to provide functionally <br />superior„ aesthetically attractive wetland areas. These activities would include <br />excavation, spoil removal, grading, and reseeding with a wet meadow mixture. <br />The estimated cost to complete the reconstruction and restoration of this I.5- acre•area <br />would be. approximately $20,000. • <br />Grading is proposed to occur in April, 2000. Revegetation will be completed in June <br />• 2000. Management activities associated with the plant community establishment will be <br />completed by October, 2003. <br />• <br />The long -term viability of this restoration is good, with low maintenance requirements. <br />otal cost of all . ro .. sed activities in items A throu ' h E would be ex ted to ran e <br />from $59.000 to $77.500. <br />F. Other Items <br />1: The feasibility of providing a buffer and filter strip to protect wetland area B5 should <br />be examined. The wetland is outside of the green way areas. <br />2. An evaluation of hydrological restoration opportunities of wetlands partially within <br />property boundaries should be completed. As adjacent parcels develop.:in•the .future, <br />potential may exist for larger wetlands along the property boundaries to be restored. <br />This applies to larger wetlands along the western and southern property boundaries. <br />3. An' informational/educational pamphlet should be prepared to distribute to <br />landowners adjacent to the green way areas. The pamphlet should include <br />information on the ecological values of the area, management efforts, and rules <br />regarding mowing, dumping, planting, etc. within the. area. <br />
The URL can be used to link to this page
Your browser does not support the video tag.