Laserfiche WebLink
4. Wheir feasible-without damaging trees and quality wetland plant communities, spoil <br />pile from>previous'excavations on the property should be removed and spread on <br />upland areas. <br />5. Detailed grading and seeding plans will be prepared prior to project implementation. <br />6, Appmpriate•infiltration methods will be utilized, where: feasible, in the placement, <br />. • . design,-and -construction-af.the trail to minimize backyard runoff from-directly <br />entering .adjacent wetlands. <br />7.. In. Year 2003, trees that have-been killed or are determined to be dying due to <br />increased water levels within Wetland Q will be removed: • <br />• <br />" iazard.Trees"-adjacent to the trail will be removed at the time the trail is <br />.constriucted. <br />