My WebLink
|
Help
|
About
|
Sign Out
Home
Search
08/26/2002 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2002
>
08/26/2002 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2014 1:50:56 PM
Creation date
2/6/2014 12:12:17 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
08/26/2002
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. Wheir feasible-without damaging trees and quality wetland plant communities, spoil <br />pile from>previous'excavations on the property should be removed and spread on <br />upland areas. <br />5. Detailed grading and seeding plans will be prepared prior to project implementation. <br />6, Appmpriate•infiltration methods will be utilized, where: feasible, in the placement, <br />. • . design,-and -construction-af.the trail to minimize backyard runoff from-directly <br />entering .adjacent wetlands. <br />7.. In. Year 2003, trees that have-been killed or are determined to be dying due to <br />increased water levels within Wetland Q will be removed: • <br />• <br />" iazard.Trees"-adjacent to the trail will be removed at the time the trail is <br />.constriucted. <br />
The URL can be used to link to this page
Your browser does not support the video tag.