Laserfiche WebLink
Spirit Hills. <br />Page 5 of 9 <br />turn lane on southbound Ware Road, and extension of Ware Road to CSAH 49 (Hodgson Road), <br />a Level of Service (LOS) A can be maintained at the Ware /CSAH 10 intersection. The analysis <br />further indicates that the intersection of CSAH 49 (Hodgson Road) and CSAH 10 (Birch Street) <br />will continue to operate at an unacceptable LOS regardless of the proposed development. <br />Improvement of this intersection will be dependent 011 reconstruction by Anoka County. It is <br />anticipated that this will be a 2004 or 2005 project. <br />Additionally, staff has investigated the possibility of restriping the Hodgson/Birch Street <br />intersection to allow an additional southbound through lane. Anoka County has stated that this <br />cannot be accommodated with the existing pavement configuration. <br />Lighting: A plan has been submitted for review. The ordinance provides for maximum lighting <br />levels of one -foot candle at the street and 0.4 when casting light onto a residential property. <br />Glare can be an issue from fixtures even if foot -candle measurements are met. Because of <br />proximity to residential uses the type of fixture will be critical. The ordinance requires that light <br />sources be hooded or controlled. The fixture proposed is a decorative, round cutoff luminaries <br />that has the option of a solid dome or a glow dome. Staff believes all of the lights should include <br />a solid dome. The submitted plan does show a combination of domes. No specific lighting type <br />has been provided for under the canopy. Lighting under the canopy shall be designed with <br />completely recessed lighting and no lighting on the canopy sides. <br />Grading and Drainage: The submitted erosion and grading plan is subject to review and <br />approval by the City Engineer. The City Engineer's comments, dated July 3, 2002, are attached. <br />Utilities: The submitted utility plan is subject to review and approval by the City Engineer. <br />The City Engineer's comments, dated July 3, 2002, are attached. <br />Easements: All standard easements are to be dedicated with the fmal plat. There is an existing <br />drainage and utility easement to be vacated that was previously platted with the Spirit Hills <br />subdivision; this shall be completed prior to issuance of a building permit. <br />Park Dedication: Park dedication has not previously been satisfied on this parcel. As a <br />result, the proposed final plat will be subject to park dedication requirements. For commercial <br />development, a park dedication requirement of $2,175.00 per acre is required. The plat includes <br />3.75 acres, which requires a park dedication of $8,156.25 to be paid prior to recording the final <br />plat. <br />Proposed Use: The development is intended to be used for Retail and Service uses <br />consistent with the GB, General Business District. Three uses proposed on the plan include a <br />Day Care Facility, Motor Fuel Station (Convenience Store) and Bank with Drive -Thru, which <br />require a Conditional Use Permit. Approval of these uses are included as part of the PDO <br />approval but are identified here for clarity in what will be permitted. <br />The Planning and Zoning Board shall recommend a conditional use permit and the Council shall <br />order the issuance of such permit only if it finds that such use at the proposed location: <br />