Laserfiche WebLink
COUNTY OF ANOKA <br />Public Services Division <br />HIGHWAY DEPARTMENT <br />1440 BUNKER LAKE BLVD. N.W., ANDOVER, MINNESOTA 55304 -4005 <br />(763) 862 -4200 FAX (763) 862 -4201 <br />August 29, 2002 <br />Mike Grochala <br />City of Lino Lakes <br />600 Town Center Parkway <br />Lino Lakes, MN 55Q14 <br />RE: Preliminary I'lat/Site Plan <br />Spirit Hills (Formerly Village Hills Commercial) <br />Dear Mike, <br />We have reviewed the Preliminary Plat/Site Plan for Spirit Hills (formerly Village Hills Commercial) to <br />be located north of CSAH 10 (Birch St,) and West of Ware Rd. within the City of Lino Lakes, and I offer <br />ithe following comments: <br />Existing right -of -way adjacent to CSAH 10 should be adequate for future reconstruction purposes <br />(60ft r/w north of the CSAH 10 r/w centerline). Additional right -of -way in the form of trail/utility <br />easements and/or construction easements may be required at some time in the future. <br />It appears that some clearing and/or grading may be required in order to meet intersection sight <br />distance requirements at the CSAH 10/Birch St intersection. The City and/or the developer shall . <br />ensure that all applicable intersection sight distance requirements are met to the fullest extent possible <br />for this development. Care should be exercised when locating landscaping/berms /trees /signs outside <br />the county right -of -way, so as not to create sight distance obstructions for vehicles entering/exiting <br />this site. Right -of- access along CSAH 10 is to be dedicated to Anoka County. Contact Mike Kelly, <br />Chief Right-of-way Agent, to coordinate the preparation of the appropriate documents for the right-of- <br />access dedication. <br />All access for this site is to be made via Ware Road, which is acceptable to this department. However, <br />the construction of this development will cause a significant increase in the number of turning <br />movements at the intersection of CSAH 10 and Ware Road. As a consequence, in order to provide for <br />the safety needs of the traveling public, turn lane construction on CSAH 10 will be required to be <br />completed in conjunction with this development. The turn lane construction shall consist of EB CSAH <br />10 left and right turn lanes, as well as WB CSAH 10 right and left turn lanes. Standard turn lanes are <br />12 -14ft wide, 300ft in length, and include a 15:1 taper. In addition, speed:1 transitions are standard <br />with the introduction of left turn lanes on a county highway. We will not require the construction of <br />raised median channelization on CSAH 10 at this time, but will instead accept painted median <br />channelization. Please contact Kirsten Olson, Design Engineer, for further information regarding the <br />pavement section and design details for the turn lane construction. <br />Affirmative Action / Equal Opportunity Employer <br />