Laserfiche WebLink
2. All comments from Anoka County Highway Department dated January 24, 2014 <br />shall be addressed. <br />3. All comments from MNDOT letter dated December 5, 2013 shall be addressed. <br />4. All comments from Environmental Coordinator letter dated February 3, 2014 <br />shall be addressed. <br />5. The Phasing Plan for development shall be incorporated into the plan set and <br />listed on the Sheet Index. <br />6. The Phasing Plan identifies 215 lots, however; the preliminary plat indicates 216 <br />lots. The Phasing Plan shall be revised. <br />7. The Floodplain Exhibit shall be incorporated into the plan set and listed on the <br />Sheet Index. <br />8. A Letter of Map Revision (LOMR) shall be obtained from the Federal Emergency <br />Management Agency (FEMA) prior to issuance of any building permits for <br />parcels located within the floodplain. <br />9. Temporary cul de sacs shall be required where a street is terminated pending <br />future extension. <br />10. Drainage and utility easements shall be dedicated over stormwater drainage areas. <br />11. Drainage and utility easements or conservation easements shall be dedicated over <br />wetland buffer areas. <br />12. Sheet 6, Preliminary Plat: <br />a. Lot 1, Block 8 and Lot 9, Block 10 shall be revised to omit the portion of <br />Outlot G that extends to Street I and a 20 feet easement shall be provided <br />over the storm sewer utility. <br />b. Lot 1, Block 1 and Lot 1, Block 11 shall have a 15 foot wide easement <br />abutting CSAH 54 for landscape buffer. <br />13. Sheet 9, Ghost Plat: <br />a. The City suggests future access through Outlot E if feasible. The current <br />proposal creates a disconnect within the development. <br />14. Sheets 10 & 11, Preliminary Site & Utility Plan: <br />a. Front and rear setback line for 65'-70' wide lots shall be shown as 25 feet. <br />Building pads may remain designed at 30 feet. <br />b. Rear setback line for 50' wide lot shall be shown as 25 feet. Building pads <br />may remain designed at 30 feet. <br />15. Sheet 14, Preliminary Grading & Erosion Control Plan: <br />a. The garage location shall be reversed to meet the 5 foot side setback on <br />Lot 7, Block 8 and Lot 22, Block 7. <br />16. Sheet L1, Planting Plan: <br />a. Remove comment that "Blvd Trees to be installed by Builder @ Time of <br />Home Construction". <br />b. City will require tree escrow and will install boulevard trees. <br />17. Sheet L2, Planting Plan: <br />a. Remove comment that "Blvd Trees to be installed by Builder @ Time of <br />Home Construction". <br />b. City will require tree escrow and will install boulevard trees. <br />18. Sheet L3, Planting Plan Buffer Enlargement: <br />a. Please verify landscape buffer plantings are allowed in NSP easement. <br />I <br />