My WebLink
|
Help
|
About
|
Sign Out
Home
Search
02/12/2014 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2014
>
02/12/2014 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2022 12:16:35 PM
Creation date
2/7/2014 2:57:11 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
02/12/2014
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
c. Submit a revised Tree Preservation and Mitigation Plan for review and <br />approval. <br />d. Install proper erosion control and tree protection fencing. <br />7. All plan sheets shall be revised and signed using Mr. Mattke's professional <br />engineering license number. <br />8. Sheet 1-Certificate of Survey: <br />a. The Certificate of Survey should represent conditions of the existing <br />parcel. <br />b. Proposed lots or blocks should not be shown. <br />c. The drainage and utility easements should be omitted unless they actually <br />exist. <br />d. "No Encroachments" should be removed since a 35 foot wide power line <br />easement exists. <br />9. Sheet 2-Resources Inventory: <br />a. "No Encroachments" should be removed since a 35 foot wide power line <br />easement exists. <br />10. Sheet 3-Preliminary Plat: <br />a. Total area, total upland and total wetland area per parcel shall be shown on <br />the preliminary plat. <br />b. The proposed Lot 3 shall be identified with the number 3. <br />c. The impervious surface for proposed Lot 2 shall be noted. <br />11. Sheet 4-Preliminary Grading, Drainage & Erosion Control Plan: <br />a. See City Engineer letter dated February 3, 2014. <br />12. Sheet 5-Preliminary Utility Plan: <br />a. The existing well shall be located on the plan sheet. <br />b. The existing house shall hook up to the municipal water system prior to <br />issuance of any building permit. <br />c. The existing well shall be properly capped and abandoned or disconnected <br />from the house if used for irrigation purposes prior to the issuance of any <br />building permit. <br />13. Sheet 6-Landscaping Plan: <br />a. Please add a note to the plan that builders shall be responsible for <br />escrowing for topsoil and sod. <br />14. Tree Preservation and Mitigation Plan <br />a. Please incorporate the Tree Preservation and Mitigation Plan into the plan <br />set as Sheet 7. <br />b. Please add a note that the individual builders will be responsible for <br />compliance with the tree preservation and mitigation ordinance such <br />identifying and tagging trees for removal and installing a protective fence. <br />Efforts shall be made to ensure tree removal occurs only when necessary <br />and only for trees located on the property. <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.