My WebLink
|
Help
|
About
|
Sign Out
Home
Search
12/09/2002 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2002
>
12/09/2002 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2014 12:56:47 PM
Creation date
2/10/2014 9:35:05 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
12/09/2002
Council Meeting Type
Work Session Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Jim Studenski, P.E. <br />City of Lino Lakes <br />November 5, 2002 <br />Page 5 <br />10. Provide Construction Sequencing and Maintenance Plan for review and consequent <br />approval. It is recommended that these items be provided to the City Engineer for review <br />prior to plan approval. <br />In specific, it is recommended as part of the Maintenance Plan that the Owner be required <br />to file yearly reports to the City describing the working condition of the stormwater <br />system by a qualified person capable of recommending corrective measures as they <br />become apparent. It should be expected that the rainwater gardens would need removal <br />and replacement for plugging on an average of three (3) years. <br />F. Provide preliminary plat for review and approval that includes all the easements for drainage and <br />utilities. <br />Should you have any questions, please feel free to contact me at 651/726 -7925. <br />Sincerely, <br />vc&,1 v9D xtD_S<, <br />Patrick M. Windier, P.E. <br />Project Engineer <br />PMW:art <br />
The URL can be used to link to this page
Your browser does not support the video tag.