My WebLink
|
Help
|
About
|
Sign Out
Home
Search
02/09/2000 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2000
>
02/09/2000 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2014 5:11:11 PM
Creation date
2/10/2014 2:02:03 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
02/09/2000
Council Meeting Type
Work Session Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />City Council <br />Stadium Schedule <br />February 9, 2000 <br />page 4 <br />Preparation of an Environmental Impact Statement (EIS) is governed by MN Rules 4410, under <br />the authority of MN Statutes 116D, the Minnesota Environmental Policy Act. <br />EIS STEPS <br />TIMELINE <br />Prepare draft scoping document. The <br />scoping document establishes the scope of <br />the EIS by identifying the issues to be <br />studied, the level of detail, etc. <br />We would need to begin preparing the RFP <br />for consultants to prepare the EIS. <br />no mandated timeline: estimate 90 days <br />Publish availability of draft scoping <br />document in EQB Monitor. <br />published every two weeks <br />"Scoping period" <br />Written and other comments taken. At <br />least one public scoping meeting. <br />30 days starting with publication date <br />Final scoping decision. <br />Within 15 days after scoping period ends. <br />Complete RFP for consultant to prepare <br />EIS. We would need the scoping decision <br />to determine the scope of work. <br />20 days <br />EIS preparation notice publication. <br />Within 45 days after the scoping decision. <br />Advertise RFP <br />30 days <br />Review proposals received and determine <br />finalists. <br />30 days <br />Interview consultants <br />15 days <br />Select consultant <br />15 days <br />Negotiate cost with project proposer <br />(project proposer pays all costs of EIS) <br />30 days <br />Consultant prepare draft EIS <br />4 months <br />Publish availability of draft EIS and <br />distribute copies of full draft or summary <br />Informational meeting <br />no less than 15 days after publication of <br />availability <br />Public comment period <br />minimum 10 days beyond meeting date <br />Prepare final EIS <br />?? <br />Publish availability of final EIS and <br />distribute copies <br />Public comment <br />minimum of 10 days starting with <br />publication of availability of final EIS <br />Determine adequacy of final EIS <br />within 280 days after EIS preparation <br />notice unless extended <br />TOTAL: approx. 15 months <br />
The URL can be used to link to this page
Your browser does not support the video tag.