My WebLink
|
Help
|
About
|
Sign Out
Home
Search
02/14/2000 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2000
>
02/14/2000 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2014 5:10:40 PM
Creation date
2/10/2014 2:14:56 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
02/14/2000
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />AGENDA ITEM 6J <br />STAFF ORIGINATOR: John Powell, City Engineer <br />COUNCIL MEETING DATE: February 14, 2000 <br />TOPIC: Resolution Number 2000 -14, Order Feasibility Report, Cedar Street <br />Improvements <br />VOTE REQUIRED: 4/4 Vote Required <br />BACKGROUND: <br />The re- construction of Cedar Street from Otter Lake Road to Elmcrest Avenue was <br />originally to be included in the contract for the re- alignment of Otter Lake Road. <br />However, when the City became aware that Cedar Street was under consideration as <br />an alignment for a new Metropolitan Council sanitary sewer interceptor, the work was <br />delayed. We did not want to reconstruct the roadway then have it disturbed again by <br />the interceptor construction. <br />The current schedule for the interceptor project is construction in 2000. This would <br />allow Cedar Street to also be re- constructed this year. The street re- construction will <br />also involve utility work. City utilities have been extended to serve the GNW Machine <br />site. They will be further extended to Elmcrest Avenue. Water system modifications in <br />the vicinity of Well No. 4, located on the southeast corner of Cedar Street and <br />Clearwater Creek Drive, will also be included. These modifications will be designed to <br />enhance the City's water system pressure capabilities. No work would occur at the <br />intersection of Otter Lake Road where it was recently re- constructed. <br />The funding sources for the project will include City utility trunk funds and assessments <br />previously levied against the Clearwater Creek subdivision. If the City approves a joint <br />powers agreement with the City of Hugo for water service, a portion of the trunk funds <br />will be immediately replaced. There may also be some costs incurred by the <br />Metropolitan Council for the restoration of areas disturbed by their project. <br />OPTIONS: <br />1. Return to staff for further review. <br />2. Adopt Resolution No. 2000 -14 ordering a report on improvements for the Cedar <br />Street Improvement project. <br />RECOMMENDATION: <br />Option No. 2 - Adopt Resolution No. 2000 -14 ordering a report, on improvements for the <br />• Cedar Street Improvement project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.