Laserfiche WebLink
AGENDA ITEM 7 E <br />STAFF ORIGINATOR: Jeff Smyser <br />C. C. MEETING DATE: August 28, 2000 <br />TOPIC: Site & Building Plan Review <br />Conditional Use Permit <br />Marmon Keystone, 265 Apollo Drive <br />VOTE REQUIRED: 3/5 <br />BACKGROUND <br />The application includes a site plan and conditional use permit. The business processes <br />metal pipe and tubing. Some outdoor storage of pipe, tubing, and other material will be <br />needed, which requires a conditional use permit. <br />This review is based on the following plan submittals though the reduced plans attached <br />here were received at a later date: <br />Preliminary Site Plan 8/3/00 <br />Preliminary Grading Plan 8/3/00 <br />Lighting Plan 8/3/00 <br />Preliminary Utility Plan 8/3/00 <br />Preliminary Landscape Plan 8/3/00 <br />Exterior Elevations rec'd 7/10/00 <br />ANALYSIS <br />The submittal complies with the LI Light Industrial zoning standards as follows: <br />Required <br />Proposed <br />8 acres <br />Lot size minimum <br />1 acre <br />Lot width minimum <br />100 ft <br />500+ ft <br />Setbacks: buildings <br />from street <br />rear lot line <br />side lot line <br />parking <br />from street <br />rear lot line <br />side lot line <br />50 ft <br />30 ft <br />10 ft <br />15 ft <br />5 ft <br />5 ft <br />50 ft <br />205 ft <br />110 ft <br />15 ft <br />470 ft <br />25 ft <br />Bldg. height <br />45 ft <br />32 ft <br />Green space <br />10% <br />>10% <br />