My WebLink
|
Help
|
About
|
Sign Out
Home
Search
02/13/2002 P&Z Minutes
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Minutes
>
2002
>
02/13/2002 P&Z Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2014 10:34:35 AM
Creation date
2/13/2014 10:34:29 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Minutes
Meeting Date
02/13/2002
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Planning & Zoning Board <br />February 13, 2002 <br />Page 7 <br />APPROVED MINUTES <br />floor area. Mr. Grochala stated this would be something they would need to address in <br />the future. <br />Chair Schaps asked the applicant if he or his engineer would like to make comment. <br />Mike Kraft from Shea Architects, Inc. stated they came up with a look that is compatible <br />with what the Board was looking for. The building will have a standing seam metal roof, <br />stucco pattern material around cornice facing, and pillars. The building color will be <br />beige which is compatible with the neighborhood. He also stated the brick colors will be <br />the same as the other brick work in the development. <br />Mr. Kraft stated they would be able to make up for the 3% difference in green space by <br />taking 300 feet away from the drive up area. <br />Mr. Kraft stated one of the differences with TCF Bank is that it is built for customer <br />convenience. He stated TCF Bank has more employees than the average bank and this <br />would account for more parking spaces. He stated there would always be an available <br />parking space for customers also. He stated people have higher expectations for service <br />from TCF Bank. <br />Mr. Rafferty asked if the colored floor plan shown was consistent with the color <br />elevation being shown. Mr. Kraft stated the revised copy is shown on the north side of <br />the building where another proposed entrance would be. <br />Mr. Rafferty asked if the cornice would have stucco on it. Mr. Kraft stated the cornice <br />would not be actual stucco; it would be stucco-like in appearance. <br />Mr. Rafferty asked if there would be a way to detract from the drive-thru. Mr. Kraft <br />stated the colonial form of the building brings attention to the building and not to the <br />drive –thru. <br />Mr. Corson made a MOTION to close the public hearing at 7:08 p.m., and was supported <br />by Mr. Lyden. Motion carried 7-0. <br />Mr. Corson made a MOTION to recommend a pproval of the TCF Bank Site Plan with <br />the following conditions: <br />1. That a site development agreement be executed by and between the City of Lino <br />Lakes and TCF Bank. <br />2. Revised Site Plan be submitted that sa tisfies the impervious surface coverage <br />requirements. <br />3. Revised Floor Plan and Details be submitted that reflects the change in building <br />entrance. <br />The motion was supported by Mr. Rafferty.
The URL can be used to link to this page
Your browser does not support the video tag.