My WebLink
|
Help
|
About
|
Sign Out
Home
Search
07/10/2002 P&Z Minutes
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Minutes
>
2002
>
07/10/2002 P&Z Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2014 10:37:35 AM
Creation date
2/13/2014 10:37:15 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Minutes
Meeting Date
07/10/2002
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Planning & Zoning Board <br />July 10, 2002 <br />Page 7 <br />APPROVED MINUTES <br />B. Site and Building Plan approval to allow the construction of 30,266 s quare feet in three <br />buildings and canopy as configured on th e site plan dated received June 14, 2002 <br />1. All refuse and recyclable mate rials shall be stored with in the principal building <br />or within an accessory structure (within a side or rear yard) that is totally <br />screened from eye level view from neighboring uses and public rights of way. <br />2. All signs shall be reviewed with the si gn permit applications and shall be required <br />the applicable requirements of the Ordinance. <br />3. Light fixture design is a solid dome va riety only and under- c anopy lighting shall <br />be submitted and subject to staff approval. There will be no canopy illumination <br />on the east, west, and north sides of the canopy. <br />4. The submitted erosion and grading plan shall be revised to incorporate the City <br />Engineer’s comments, dated July 3, 2002. <br />5. The submitted utility plan sh all be revised to incor porate the City Engineer’s <br />comments, dated July 3, 2002. <br />6. Stop signs shall be installed and maintain ed at the access points with the public <br />road. <br />7. The Rice Creek Watershed District issues a permit to allow the development <br />proposal and the conditions requi red by it are fulfilled. <br />8. A Watershed District Permit is received prior to City build ing permit issuance. <br />9. A final plat and vacation of easements shall be submitted and approved by the <br />City. The plat shall also include dedica tion of access control, along Birch Street, <br />to Anoka County. <br />10. Prior to the commencement of any site work, the applicant enters into a <br />performance agreement with the City and post all the necessary securities <br />required by it. <br />11. No exterior audio system associated with the site. <br />12. Limiting hours of operations from 5:00 a.m. to 11:30 p.m. <br />13. Subject to Anoka County traffic approval. <br />14. The net lawn spaces be noted and marked. <br />15.CEPTED Review. <br />Mr. Lyden expressed concern about neighborhood businesses a nd the issues they raise. <br />He stated his concern was about protecting th e neighborhoods. He as ked what the traffic
The URL can be used to link to this page
Your browser does not support the video tag.